SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Risk assessment and management practices (RAMP) within the Tanzania construction industry: Implementation barriers and advocated solutions
16 references·0 citing·43 second hop
Risk assessment and management practices (RAMP) within the Tanzania construction industry: Implementation barriers and advocated solutions (2014)Risk assessment and management practices …Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Towards a better modelling an…Risk management in small construction projects in Singapore: Status, barriers and impact (2013)Risk management in small cons…Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania (2013)Causes and Effects of Delays …Asking questions, analysing answers: relative importance revisited (2013)Asking questions, analysing a…The Adoption and Design of Enterprise Risk Management Practices: An Empirical Study (2011)The Adoption and Design of En…Factors affecting contractors’ risk attitudes in construction projects: Case study from China (2010)Factors affecting contractors…Critical success criteria for mass house building projects in developing countries (2007)Critical success criteria for…Construction Delays and Their Causative Factors in Nigeria (2006)Construction Delays and Their…Project risk management in the Queensland engineering construction industry: a survey (2003)Project risk management in th…Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Survey research in operations management: a process‐based perspective (2002)Survey research in operations…Enhancing integration and innovation in construction (2002)Enhancing integration and inn…A systematic approach to risk management for construction (2001)A systematic approach to risk…Risk analysis and management in construction (1997)Risk analysis and management …Review of Psychometric theory (2nd ed.). (1979)Review of Psychometric theory…Coefficient Alpha and the Internal Structure of Tests (1951)Coefficient Alpha and the Int…Use and benefits of tools for project risk management (2001)Large engineering project risk management using a Bayesian belief network (2008)Managing global megaprojects: Complexity and risk management (2013)Risk Identification and Common Risks in Construction: Literature Review and Content Analysis (2019)Customer Satisfaction, Market Share, and Profitability: Findings From Sweden (1994)Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria (1999)The “real” success factors on projects (2002)Future criteria for success of building projects in Malaysia (2010)The relationship between success criteria and success factors in organisational event projects (2013)The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran (2018)The reflective practitioner: How professionals think in action (1984)The Reflective Practitioner: How Professionals Think in Action (1985)Impact of risk management on project performance: the importance of soft skills (2014)Analytic Hierarchy Process (2005)Understanding the key risks in construction projects in China (2007)Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects (2016)Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas (2018)Quality-Control Handbook. (1952)Survey Methods in Social Investigation. (1958)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Exploring delay causes of road construction projects in Egypt (2016)Stakeholder-Associated Supply Chain Risks and Their Interactions in a Prefabricated Building Project in Hong Kong (2018)Causes of delays on construction projects: a comprehensive list (2019)SERVQUAL: A multiple-Item Scale for measuring consumer perceptions of service quality (1988)Towards a sustainable fashion retail supply chain in Europe: Organisation and performance (2008)Supply chain collaboration for sustainability: A literature review and future research agenda (2017)TWO CRITERIA FOR GOOD MEASUREMENTS IN RESEARCH: VALIDITY AND RELIABILITY (2017)Measurement and prediction (1950)Intraclass correlations: Uses in assessing rater reliability. (1979)The Pittsburgh sleep quality index: A new instrument for psychiatric practice and research (1989)The theory of planned behavior (1991)Auditor size and audit quality (1981)Gambling with the House Money and Trying to Break Even: The Effects of Prior Outcomes on Risky Choice (1990)Advances in prospect theory: Cumulative representation of uncertainty (1992)Enterprise risk management in SMEs: Towards a structural model (2014)The Valuation Implications of Enterprise Risk Management Maturity (2014)Enterprise Risk Management Practices and Firm Performance, the Mediating Role of Competitive Advantage and the Moderating Role of Financial Literacy (2018)Structural equation modeling in practice: A review and recommended two-step approach. (1988)Common method biases in behavioral research: A critical review of the literature and recommended remedies. (2003)A new criterion for assessing discriminant validity in variance-based structural equation modeling (2014)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)The effect of relationship management on project performance in construction (2011)
this work references cited by second hop

References

  • 1951Coefficient Alpha and the Internal Structure of Tests43,892 cited
  • 1979Review of Psychometric theory (2nd ed.).11,425 cited
  • 2002Survey research in operations management: a process‐based perspective1,610 cited
  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 1997Risk analysis and management in construction758 cited
  • 2013Towards a better modelling and assessment of construction risk: Insights from a literature review357 cited
  • 2006Construction Delays and Their Causative Factors in Nigeria350 cited
  • 2003Project risk management in the Queensland engineering construction industry: a survey340 cited
  • 2007Critical success criteria for mass house building projects in developing countries305 cited
  • 2011The Adoption and Design of Enterprise Risk Management Practices: An Empirical Study288 cited
  • 2001A systematic approach to risk management for construction276 cited
  • 2013Risk management in small construction projects in Singapore: Status, barriers and impact235 cited
  • 2013Asking questions, analysing answers: relative importance revisited231 cited
  • 2010Factors affecting contractors’ risk attitudes in construction projects: Case study from China216 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2002Enhancing integration and innovation in construction215 cited
  • 2013Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania203 cited
  • Cited by

    No citing works inside the corpus for this window.