SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Proactive schedule management of industrial turnkey projects in developing countries
7 references·2 citing·32 second hop
Proactive schedule management of industrial turnkey projects in developing countries (2003)Proactive schedule management of industri…IEEE Guide Adoption of PMI Standard - A Guide to the Project Management Body of Knowledge (2003)IEEE Guide Adoption of PMI St…Earned value in project management (2003)Earned value in project manag…Project Management for Engineering and Construction (1993)Project Management for Engine…Professional construction management : including C.M., design-construct, and general contracting (1992)Professional construction man…Managing the international project environment (1992)Managing the international pr…Project management in construction (1985)Project management in constru…Construction Project Management (1972)Construction Project Manageme…Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects (2012)Factors Causing Design Schedu…Influences on construction project delivery time (2010)Influences on construction pr…The Causal Texture of Organizational Environments (1965)Designing Complex Organizations (1973)Fundamentals of the total ethical-risk analysis method (TERAmethod) with a study of crucial problems in managing distributed multimedia (1996)Scanning the business environment (2008)Culture, an excuse?—A critical analysis of essentialist assumptions in cross-cultural management research and practice (2018)Information, power, and location: World Bank staff decentralization and aid project success (2020)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Causes of delay in large construction projects (2006)Sampling Knowledge: The Hermeneutics of Snowball Sampling in Qualitative Research (2008)A force for change : how leadership differs from management (1990)Managing with Power: Politics and Influence in Organizations. (1993)The handbook of project based management (1993)Beyond the point of no return: On the management of deviations (2007)Deviations and the breakdown of project management principles (2009)A stakeholder network perspective on unexpected events and their management in international projects (2010)Practical Research: Planning and Design (1990)The fifth discipline, the art and practice of the learning organization (1991)The “real” success factors on projects (2002)An exploration towards a production theory and its application to construction (2000)An integrated survey of deterministic project scheduling (2001)On the merits and pitfalls of critical chain scheduling (2001)Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs (1997)Probability of Project Completion Using Stochastic Project Scheduling Simulation (2005)Causes of claims in road construction projects in the UAE (2016)The concept of project complexity—a review (1996)Modelling global risk factors affecting construction cost performance (2003)Earned Value Project Management Method and Extensions (2003)Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns (2005)THE HANDBOOK OF PROJECT-BASED MANAGEMENT (2008)Total quality management in the construction process (1997)Resource-Activity Critical-Path Method for Construction Planning (2003)Impact of Job Stressors and Stress on the Safety Behavior and Accidents of Construction Workers (2015)
this work references cited by second hop

References

  • 2003Earned value in project management418 cited
  • 1985Project management in construction370 cited
  • 1993Project Management for Engineering and Construction215 cited
  • 2003IEEE Guide Adoption of PMI Standard - A Guide to the Project Management Body of Knowledge133 cited
  • 1972Construction Project Management132 cited
  • 1992Professional construction management : including C.M., design-construct, and general contracting107 cited
  • 1992Managing the international project environment41 cited

Cited by

  • 2010Influences on construction project delivery time26 cited
  • 2012Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work