SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Project-oriented resource assignment: from business process modelling to business process instantiation with operational performance consideration
10 references·0 citing·48 second hop
Project-oriented resource assignment: from business process modelling to business process instantiation with operational performance consideration (2007)Project-oriented resource assignment: fro…Towards a truly integrated enterprise modeling and analysis environment (2003)Towards a truly integrated en…Designing performance analysis and IDEF0 for enterprise modelling in BPR (2002)Designing performance analysi…Process analysis and reengineering (2001)Process analysis and reengine…Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling (2001)Analysis of Scheduling Scheme…CIMOSA: enterprise engineering and integration (1999)CIMOSA: enterprise engineerin…ARIS — Business Process Modeling (1999)ARIS — Business Process Model…Using tabu search to schedule activities of stochastic resource-constrained projects (1998)Using tabu search to schedule…Optimization analysis for design and planning of multi-project programs (1998)Optimization analysis for des…What to be implemented at the early stage of a large-scale project (1997)What to be implemented at the…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A market-based multi-agent system model for decentralized multi-project scheduling (2006)A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (2007)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)Process innovation: reengineering work through information technology (1993)Reengineering the corporation: A manifesto for business revolution (1993)Flexibility to Manufacturing Process Reengineering for Mass Customization (2005)Information modeling and reengineering for product development process (2007)The Analytic Supporting Tools for Business Reengineering With System Integration Design (2010)The New Industrial Engineering: Information Technology and Business Process Redesign (2011)Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Project scheduling with resource constraints: A branch and bound approach (1987)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A framework for information systems architecture (1987)Decision support systems and intelligent systems (1997)A Systematic Literature Review of Consistency Among Business Process Models (2016)Reconfigurable Supply Chains: An Integrated Framework (2016)Consistency requirements in business process modeling: a thorough overview (2017)Strategic orientation of business enterprises: the construct, dimensionality, and measurement (1989)Reengineering the Corporation (1993)Reengineering of design and manufacturing processes (1994)Models for compassionate operations (2012)Process Coordination Within a Health Care Service Supply Network (2015)Sustainable Supply Chain Management in the Automotive Industry: A Process-Oriented Review (2019)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)The general employee scheduling problem. An integration of MS and AI (1986)A survey on the resource-constrained project scheduling problem (1995)Project scheduling under uncertainty: Survey and research potentials (2004)Robust and reactive project scheduling: a review and classification of procedures (2004)Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (2015)Critical-Path Planning and Scheduling: Mathematical Basis (1961)No project is an island: linking projects to history and context (2003)The resource allocation syndrome: the prime challenge of multi-project management? (2003)A genetic algorithm for the resource constrained multi-project scheduling problem (2007)Impact of various work-breakdown structures on project conceptualization (1994)Organization of public-private partnership projects (1994)From Design to Production Control Through the Integration of Engineering Data Management and Workflow Management Systems (1998)The integration of product data and workflow management systems in a large scale engineering database application (2002)Optimizing the Integrity of Safety Critical Petroleum Assets: A Project Conceptualization Approach (2018)What is ERP? (2000)A configurable reference modelling language (2005)Seven process modeling guidelines (7PMG) (2009)A framework for investigation into extended enterprise resilience (2010)An Exploration of Enterprise Architecture Research (2013)Exploring the future of enterprise architecture: A Zachman perspective (2015)
this work references cited by second hop

References

  • 1999ARIS — Business Process Modeling792 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1999CIMOSA: enterprise engineering and integration220 cited
  • 2001Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling144 cited
  • 2002Designing performance analysis and IDEF0 for enterprise modelling in BPR107 cited
  • 1998Using tabu search to schedule activities of stochastic resource-constrained projects100 cited
  • 1998Optimization analysis for design and planning of multi-project programs75 cited
  • 1997What to be implemented at the early stage of a large-scale project58 cited
  • 2001Process analysis and reengineering34 cited
  • 2003Towards a truly integrated enterprise modeling and analysis environment27 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work