SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
The use of fuzzy variables in pert
2 references·16 citing·34 second hop
The use of fuzzy variables in pert (1981)The use of fuzzy variables in pertAn Analytical Study of the PERT Assumptions (1964)An Analytical Study of the PE…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…A model of resilient supply chain network design: A two-stage programming with fuzzy shortest path (2013)A model of resilient supply c…Project cash flow analysis in the presence of uncertainty in activity duration and cost (2011)Project cash flow analysis in…Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Fuzzy critical chain method f…Applying fuzzy method for measuring criticality in project network (2007)Applying fuzzy method for mea…Analysis of critical paths in a project network with fuzzy activity times (2006)Analysis of critical paths in…On latest starting times and floats in activity networks with ill-known durations (2003)On latest starting times and …Unified approach to fuzzy graph problems (2002)Unified approach to fuzzy gra…The computational complexity of the criticality problems in a network with interval activity times (2002)The computational complexity …Use of fuzzy numbers in project risk (criticality) assessment (2001)Use of fuzzy numbers in proje…Critical path analysis in the network with fuzzy activity times (2001)Critical path analysis in the…A GA-based fuzzy optimal model for construction time–cost trade-off (2001)A GA-based fuzzy optimal mode…Fuzzy set theory applications in production management research: a literature survey (1998)Fuzzy set theory applications…Project-Network Analysis Using Fuzzy Sets Theory (1996)Project-Network Analysis Usin…An efficient approach for large scale project planning based on fuzzy Delphi method (1995)An efficient approach for lar…A procedure for ranking fuzzy numbers using fuzzy relations (1988)A procedure for ranking fuzzy…Using fuzzy sets in operational research (1983)Using fuzzy sets in operation…Fuzzy sets (1965)Fuzzy sets (1996)Supply chain management: a modular Fuzzy Inference System approach in supplier selection for new product development (2007)Logistics network design for product recovery in fuzzy environment (2009)The International Journal of Production Research (2013)A state of the art review of intelligent scheduling (2018)Fuzzy Sets and Systems - Theory and Applications (1980)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Six decades of project management research: Thematic trends and future opportunities (2016)A robust optimization approach for the multi-mode resource-constrained project scheduling problem (2019)Multiple Attribute Decision Making: Methods and Applications (1981)Selection and application of risk management tools and techniques for build‐operate‐transfer projects (2004)Project Network Interdependency Alignment: New Approach to Assessing Project Effectiveness (2010)A review of some methods for ranking fuzzy subsets (1985)A fuzzy multicriteria decision-making method for material selection (1996)Selecting IS personnel use fuzzy GDSS based on metric distance method (2003)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)Are complexity and uncertainty distinct concepts in project management? A taxonomical examination from literature (2016)Ranking fuzzy numbers with maximizing set and minimizing set (1985)Fuzzy Mathematical Techniques With Applications (1986)Solving the fuzzy shortest path problem using multi-criteria decision method based on vague similarity measure (2012)Notes on “Bipolar fuzzy graphs” (2013)Interval Type 2 Fuzzy Set in Fuzzy Shortest Path Problem (2016)Quantifying vagueness in decision models (1985)Decision Making in a Fuzzy Environment (2007)Financial portfolio management through the goal programming model: Current state-of-the-art (2013)Novel fuzzy hybrid multi-criteria group decision making approaches for the strategic supplier selection problem (2014)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)Critical-path planning and scheduling (1959)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Bid/no-bid decision-making – a fuzzy linguistic approach (2004)Overview of the Application of “Fuzzy Techniques” in Construction Management Research (2009)
this work references cited by second hop

References

  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1964An Analytical Study of the PERT Assumptions283 cited

Cited by

  • 2001Critical path analysis in the network with fuzzy activity times236 cited
  • 2007Fuzzy critical chain method for project scheduling under resource constraints and uncertainty201 cited
  • 2001A GA-based fuzzy optimal model for construction time–cost trade-off182 cited
  • 1998Fuzzy set theory applications in production management research: a literature survey181 cited
  • 1983Using fuzzy sets in operational research164 cited
  • 1996Project-Network Analysis Using Fuzzy Sets Theory156 cited
  • 1988A procedure for ranking fuzzy numbers using fuzzy relations153 cited
  • 2002Unified approach to fuzzy graph problems137 cited
  • 2013A model of resilient supply chain network design: A two-stage programming with fuzzy shortest path115 cited
  • 2007Applying fuzzy method for measuring criticality in project network113 cited
  • 1995An efficient approach for large scale project planning based on fuzzy Delphi method112 cited
  • 2006Analysis of critical paths in a project network with fuzzy activity times112 cited
  • 2011

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Project cash flow analysis in the presence of uncertainty in activity duration and cost
110 cited
  • 2003On latest starting times and floats in activity networks with ill-known durations103 cited
  • 2001Use of fuzzy numbers in project risk (criticality) assessment103 cited
  • 2002The computational complexity of the criticality problems in a network with interval activity times85 cited