SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Float Types in Linear Schedule Analysis with Singularity Functions
15 references·1 citing·29 second hop
Float Types in Linear Schedule Analysis with Singularity Functions (2009)Float Types in Linear Schedule Analysis w…Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling (2004)Critical path determination b…Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Comparison of Linear Scheduli…Challenges in Line-of-Balance Scheduling (2002)Challenges in Line-of-Balance…Linear Scheduling Model: Float Characteristics (2001)Linear Scheduling Model: Floa…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Linear Scheduling Model: Development of Controlling Activity Path (1998)Linear Scheduling Model: Deve…Construction Management (1997)Construction ManagementActivity nets: A guided tour through some recent developments (1995)Activity nets: A guided tour …LINEAR SCHEDULING AND VISUALIZATION (1992)LINEAR SCHEDULING AND VISUALI…Formal Development of Line‐of‐Balance Technique (1990)Formal Development of Line‐of…Extensions to Linear Scheduling Optimization (1988)Extensions to Linear Scheduli…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing (2010)Optimizing Cash Flows for Lin…Critical-Path Planning and Scheduling: Mathematical Basis (1961)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Project management : a systems approach to planning, scheduling, and controlling (1995)A review of the contribution of Operational Research to Project Management (2002)Project scheduling with inventory constraints (2003)Project Management with Dynamic Scheduling (2012)Professional Construction Management (1976)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Resource-driven scheduling of repetitive activities (1998)Effect of learning on line-of-balance scheduling (2001)Modern Construction Management (2012)Construction Planning for Linear Projects (1980)Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)Optimization model for resource assignment problems of linear construction projects (2006)Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)Planning Construction of Repetitive Building Units (1974)Automated progress monitoring system for linear infrastructure projects using satellite remote sensing (2016)Scheduling project networks with resource constraints and time windows (1988)Automated trade‐off between time and cost in planning repetitive construction projects (2009)Optimised scheduling for weather sensitive offshore construction projects (2016)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Application of Linear Scheduling (1986)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Optimizing linear project scheduling with multi-skilled crews (2012)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation (2018)The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)
this work references cited by second hop

References

  • 1998Scheduling Projects with Repeating Activities309 cited
  • 1998Linear Scheduling Model: Development of Controlling Activity Path168 cited
  • 2002Challenges in Line-of-Balance Scheduling167 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1995Activity nets: A guided tour through some recent developments139 cited
  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 1988Extensions to Linear Scheduling Optimization101 cited
  • 1990Formal Development of Line‐of‐Balance Technique90 cited
  • 1997Construction Management89 cited
  • 2003Comparison of Linear Scheduling Model and Repetitive Scheduling Method83 cited
  • 1992LINEAR SCHEDULING AND VISUALIZATION52 cited
  • 2004Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling51 cited
  • 2001Linear Scheduling Model: Float Characteristics48 cited

Cited by

  • 2010

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing
35 cited