SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Modified But-For Method for Delay Analysis
3 references·1 citing·12 second hop
Modified But-For Method for Delay Analysis (2005)Modified But-For Method for Delay AnalysisSchedule Delay Analysis (2016)Schedule Delay AnalysisComputer aided construction delay analysis and claims preparation (1995)Computer aided construction d…Concurrent Delays in Construction Projects (1987)Concurrent Delays in Construc…Review of Delay Analysis Methods: A Process-Based Comparison (2009)Review of Delay Analysis Meth…Construction delay analysis techniques (1996)Comparison of Delay Analysis Methodologies (1998)Selecting a delay analysis method in resolving construction claims (2005)Reasons for Cost and Schedule Increase for Engineering Design Projects (2002)Analyzing Schedule Delay of Mega Project: Lessons Learned From Korea Train Express (2009)Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Daily Windows Delay Analysis (2005)Delay Analysis within Construction Contracting Organizations (2008)An Overarching Review on Delay Analyses in Construction Projects (2021)Analysis Methods in Time-Based Claims (2008)Factors influencing Time and Cost Overruns on Freeform Construction Projects (2019)Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects (2023)
this work references cited by second hop

References

  • 1987Concurrent Delays in Construction Projects141 cited
  • 1995Computer aided construction delay analysis and claims preparation89 cited
  • 2016Schedule Delay Analysis64 cited

Cited by

  • 2009Review of Delay Analysis Methods: A Process-Based Comparison39 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work