SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Forecast Horizons in the Discounted Dynamic Lot Size Model
4 references·3 citing·22 second hop
Forecast Horizons in the Discounted Dynamic Lot Size Model (1992)Forecast Horizons in the Discounted Dynam…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models (1990)Existence of Forecast Horizon…Mathematical methods of game and economic theory (1979)Mathematical methods of game …Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results (1975)Planning Horizons for the Dyn…Stabilized‐Cycle Strategy for Capacitated Lot Sizing with Multiple Products: Fill‐Rate Constraints in Rolling Schedules (2017)Stabilized‐Cycle Strategy for…Optimal Backlogging Over an Infinite Horizon Under Time-Varying Convex Production and Inventory Costs (2008)Optimal Backlogging Over an I…Learning in Setups: Analysis, Minimal Forecast Horizons, and Algorithms (1996)Learning in Setups: Analysis,…Dynamic Version of the Economic Lot Size Model (1958)A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time (1991)Forecast horizons for a two-echelon dynamic lot-sizing problem (2022)From EOQ Towards ZI (1987)How Many Parts to Make at Once (1990)Infinite Horizon Production Planning in Time-Varying Systems with Convex Production and Inventory Costs (1998)A dynamic model for the single-vendor, multi-buyer problem (1999)Stochastic Processes, Optimization, and Control Theory: Applications in Financial Engineering, Queueing Networks, and Manufacturing Systems (2006)The Status of Mathematical Inventory Theory (1966)A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach (1969)An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints (1978)HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* (1980)Remanufacturing planning for the reverse Wagner/Whitin models (2000)Performance Measurement in a Downside Risk Framework (1994)Models for production planning under uncertainty: A review (2006)Dynamic modeling and control of supply chain systems: A review (2007)Cooperative Fuzzy Games (1981)Coherent allocation of risk capital (2001)Intertemporal asset pricing under knightian uncertainty (2004)Perishable Inventory Theory: A Review (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Quantitative models for reverse logistics: A review (1997)
this work references cited by second hop

References

  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 1979Mathematical methods of game and economic theory681 cited
  • 1975Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results192 cited
  • 1990Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models49 cited

Cited by

  • 2017Stabilized‐Cycle Strategy for Capacitated Lot Sizing with Multiple Products: Fill‐Rate Constraints in Rolling Schedules21 cited
  • 2008Optimal Backlogging Over an Infinite Horizon Under Time-Varying Convex Production and Inventory Costs19 cited
  • 1996Learning in Setups: Analysis, Minimal Forecast Horizons, and Algorithms18 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work