A simulated annealing hyperheuristic for construction resource levelling
15 references·2 citing·41 second hop
A simulated annealing hyperheuristic for construction resource levelling (2010)A simulated annealing hyperheuristic for …Industrial Engineering (2020)Industrial EngineeringAn investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem (2003)An investigation of a hyperhe…A Tabu-Search Hyperheuristic for Timetabling and Rostering (2003)A Tabu-Search Hyperheuristic …Project Scheduling: A Research Handbook (2002)Project Scheduling: A Researc…Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource leveling in construc…Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (2000)Procedures for resource level…Modification of Minimum Moment Approach in Resource Leveling (2000)Modification of Minimum Momen…Design and Analysis of Experiments (2000)Design and Analysis of Experi…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach (1999)Multiheuristic Approach for R…Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…Optimal resource leveling using non-serial dyanamic programming (1994)Optimal resource leveling usi…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Construction performance control by networks (1976)Construction performance cont…A reduced variable neighborhood search-based hyperheuristic for the shelf space allocation problem (2020)A reduced variable neighborho…A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)A Parallel Branch and Bound A…Nurse scheduling with tabu search and strategic oscillation (1998)A Hyperheuristic Approach to Scheduling a Sales Summit (2001)A Memetic Approach to the Nurse Rostering Problem (2001)An Investigation of a Tabu-Search-Based Hyper-Heuristic for Examination Timetabling (2005)Evolving timetabling heuristics using a grammar-based genetic programming hyper-heuristic framework (2009)A Reinforcement Learning - Great-Deluge Hyper-Heuristic for Examination Timetabling (2010)Scheduling project networks with resource constraints and time windows (1988)Project management — A managerial approach (1989)Project scheduling : recent models, algorithms, and applications (1999)Project selection, scheduling and resource allocation with time dependent returns (2007)Resource-constrained project scheduling problem: review of past and recent developments (2018)Operational Research: methods and applications (2023)Critical path methods in construction practice (1970)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Mixed-integer linear programming for resource leveling problems (2012)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Building effective decision support systems (1982)Decision support and expert systems (1993)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Metaheuristics for project and construction management – A state-of-the-art review (2011)The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm (2012)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Schedule Optimization Using Genetic Algorithms (1991)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Robust and reactive project scheduling: a review and classification of procedures (2004)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)A graph-based hyper-heuristic for educational timetabling problems (2005)A survey of metaheuristic-based techniques for University Timetabling problems (2007)A survey of search methodologies and automated system development for examination timetabling (2008)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)The Mobius modeling tool (2002)Response Surface Methodology: A Retrospective and Literature Survey (2004)Foot measurements from three-dimensional scans: A comparison and evaluation of different methods (2006)
this work references cited by second hop

References

  • 2000Design and Analysis of Experiments1,158 cited
  • 2002Project Scheduling: A Research Handbook716 cited
  • 2003A Tabu-Search Hyperheuristic for Timetabling and Rostering509 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 2000Resource leveling in construction by genetic algorithm-based optimization and its decision support system application160 cited
  • 2000Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints148 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 2003An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem131 cited
  • 2020Industrial Engineering104 cited
  • 1994Optimal resource leveling using non-serial dyanamic programming97 cited
  • 1999Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach95 cited
  • 1976Construction performance control by networks94 cited
  • 2000Modification of Minimum Moment Approach in Resource Leveling

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

53 cited

Cited by

  • 2016A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags41 cited
  • 2020A reduced variable neighborhood search-based hyperheuristic for the shelf space allocation problem17 cited