SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Isolated Collapsed But-For Delay Analysis Methodology
10 references·0 citing·30 second hop
Isolated Collapsed But-For Delay Analysis Methodology (2009)Isolated Collapsed But-For Delay Analysis…Review of Delay Analysis Methods: A Process-Based Comparison (2009)Review of Delay Analysis Meth…Selecting a delay analysis method in resolving construction claims (2005)Selecting a delay analysis me…Modified But-For Method for Delay Analysis (2005)Modified But-For Method for D…Daily Windows Delay Analysis (2005)Daily Windows Delay AnalysisImproving existing delay analysis techniques for the establishment of delay liabilities (2004)Improving existing delay anal…Comparison of Delay Analysis Methodologies (1998)Comparison of Delay Analysis …A methodology for assessing construction project delays (1998)A methodology for assessing c…Construction delay analysis techniques (1996)Construction delay analysis t…Computer aided construction delay analysis and claims preparation (1995)Computer aided construction d…Concurrent Delays in Construction Projects (1987)Concurrent Delays in Construc…Construction Delay Analysis under Multiple Baseline Updates (2007)An investigation into the use of construction delay and disruption analysis methodologies (2008)Schedule Delay Analysis (2016)Critical path methods in construction practice (1970)The effects of construction delays on project delivery in Nigerian construction industry (2002)Construction Delays and Their Causative Factors in Nigeria (2006)Analyzing delay causes in Egyptian construction projects (2013)Professional Construction Management (1976)Precedence and Arrow Networking Techniques for Construction (1980)Construction Project Scheduling (1991)Process Model for Administrating Construction Claims (2002)Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs (2013)Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol (2018)Construction delays in a fast-growing economy: Comparing Thailand with other economies (1996)Factors of Non-Excusable Delays That Influence Contractors' Performance (1998)Significant factors causing delay in the UAE construction industry (2006)Factors influencing the selection of delay analysis methods in construction projects in UAE (2018)Reasons for Cost and Schedule Increase for Engineering Design Projects (2002)Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Exploring delay causes of road construction projects in Egypt (2016)Delay Analysis within Construction Contracting Organizations (2008)Critical path effect based delay analysis method for construction projects (2011)Causes of Construction Delays in Countries with High Geopolitical Risks (2016)Delays in construction projects: The case of Jordan (2007)Effect of organizational culture on delay in construction (2016)The top 10 universal delay factors in construction projects (2018)An Overarching Review on Delay Analyses in Construction Projects (2021)Causes and effects of delays in Malaysian construction industry (2007)Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka (2016)A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™ (2018)
this work references cited by second hop

References

  • 2005Selecting a delay analysis method in resolving construction claims212 cited
  • 1996Construction delay analysis techniques160 cited
  • 1987Concurrent Delays in Construction Projects141 cited
  • 1998Comparison of Delay Analysis Methodologies122 cited
  • 1998A methodology for assessing construction project delays98 cited
  • 1995Computer aided construction delay analysis and claims preparation89 cited
  • 2005Daily Windows Delay Analysis83 cited
  • 2005Modified But-For Method for Delay Analysis45 cited
  • 2009Review of Delay Analysis Methods: A Process-Based Comparison39 cited
  • 2004Improving existing delay analysis techniques for the establishment of delay liabilities36 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work