Resource levelling for projects with schedule-dependent time windows
7 references·8 citing·37 second hop
Resource levelling for projects with schedule-dependent time windows (1999)Resource levelling for projects with sche…Minimizing Resource Availability Costs in Time-Limited Project Networks (1995)Minimizing Resource Availabil…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Minimizing Costs of Resource …Management Guide to PERT/CPM (1969)Management Guide to PERT/CPMProject management with CPM and PERT (1965)Project management with CPM a…Resource-constrained multi-project scheduling with activity and time flexibility (2020)Resource-constrained multi-pr…The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)The Multimode Resource‐Constr…Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (2017)Mixed-integer linear programm…An effective genetic algorithm for the resource levelling problem with generalised precedence relations (2017)An effective genetic algorith…A genetic algorithm for the robust resource leveling problem (2015)A genetic algorithm for the r…A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities (2013)A new tabu search-based hyper…Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm (2011)Construction Resource Allocat…A new heuristic for the multi-mode resource investment problem (2004)A new heuristic for the multi…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Project Scheduling: A Research Handbook (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags (2017)A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling (2020)Critical path methods in construction practice (1970)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Mixed-integer linear programming for resource leveling problems (2012)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Activity networks: Project planning and control by network models (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A Constraint-Based Method for Project Scheduling with Time Windows (2002)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (2006)Project Management with Dynamic Scheduling (2012)Operational Research: methods and applications (2023)Intransitive Indifference in Preference Theory: A Survey (1970)Stochastic scheduling problems I — General strategies (1984)Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (2000)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Stochastic Programming (2010)A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)Journal of Industrial Engineering (2017)Stochastic Project Scheduling with Hierarchical Alternatives (2017)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Project scheduling under uncertainty: Survey and research potentials (2004)Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects (2019)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)An investigation into the fundamentals of critical chain project scheduling (2001)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Project management with time, cost, and quality considerations (1996)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)
this work references cited by second hop

References

  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1965Project management with CPM and PERT305 cited
  • 1969Management Guide to PERT/CPM304 cited
  • 1984Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time204 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 1995Minimizing Resource Availability Costs in Time-Limited Project Networks136 cited

Cited by

  • 2013A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities68 cited
  • 2018The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects67 cited
  • 2015A genetic algorithm for the robust resource leveling problem54 cited
  • 2004A new heuristic for the multi-mode resource investment problem49 cited
  • 2017An effective genetic algorithm for the resource levelling problem with generalised precedence relations47 cited
  • 2020Resource-constrained multi-project scheduling with activity and time flexibility47 cited
  • 2011Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

44 cited
  • 2017Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems43 cited