SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimal production run time for two-stage production system with imperfect processes and allowable shortages
15 references·0 citing·33 second hop
Optimal production run time for two-stage production system with imperfect processes and allowable shortages (2010)Optimal production run time for two-stage…Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages (2006)Optimal production run length…Optimal batch sizing in a multi-stage production system with rework consideration (2006)Optimal batch sizing in a mul…Effect of inspection errors and preventive maintenance on a two-stage production inventory system (2006)Effect of inspection errors a…Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process (2002)Quality improvement, setup co…An optimal production run time with imperfect production processes and allowable shortages (2002)An optimal production run tim…Optimal two-stage lot sizing and inventory batching policies (1999)Optimal two-stage lot sizing …Analysis of a production–inventory system with machine breakdowns and shutdowns (1999)Analysis of a production–inve…An optimal production run length in deteriorating production processes (1999)An optimal production run len…Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions (1998)Note: The economic manufactur…Joint investment in quality improvement and setup reduction (1995)Joint investment in quality i…Production Lot Sizing with Machine Breakdowns (1992)Production Lot Sizing with Ma…Justifying New Technology Acquisition Through its Impact on the Cost of Running an Inventory Policy (1988)Justifying New Technology Acq…Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction (1986)Optimal Lot Sizing, Process Q…Economic Production Cycles with Imperfect Production Processes (1986)Economic Production Cycles wi…Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems (1983)Non-inteǵer optimal lot size …The EOQ repair and waste disposal model with variable setup numbers (1996)The extended EOQ repair and waste disposal model (1996)Dynamic Version of the Economic Lot Size Model (2004)Decision Systems for Inventory Management and Production Planning (1979)Production and inventory management (1983)An imperfect production process for time varying demand with inflation and time value of money – An EMQ model (2011)Inventory management and production planning and scheduling (1999)A deterministic, multi-item inventory model with supplier selection and imperfect quality (2007)Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process (2013)A sustainable development framework for a cleaner multi-item multi-stage textile production system with a process improvement initiative (2019)Economic production quantity model for items with imperfect quality (2000)On optimal batch sizing in a multi-stage production system with rework consideration (2008)Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate (2016)Investing in Reduced Setups in the EOQ Model (1985)THE CLASSIC ECONOMIC PRODUCTION QUANTITY MODEL WITH SETUP COST AS A FUNCTION OF CAPITAL EXPENDITURE* (1987)The value of setup cost reduction and process improvement for the economic production quantity model with defects (2005)A framework for choosing among different lean-based improvement programs (2015)Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction (2016)Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems (1988)A note on “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns” (2009)An inventory model with reliability in an imperfect production process (2011)A mathematical model on EPQ for stochastic demand in an imperfect production system (2013)Total quality control (1961)Lot Sizing with Random Yields: A Review (1995)Closed-Loop Supply Chain Models with Product Remanufacturing (2004)The Impact of Imperfect Processes on Production Run Times (2000)Robust planning in optimization for production system subject to random machine breakdown and failure in rework (2009)A tight approximation for an EOQ model with supply disruptions (2014)A discrete-time Markov production-inventory model with machine breakdowns (2001)Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown (2009)An EMQ model in an imperfect production process (2010)Communication and Uncertainty in Concurrent Engineering (1998)Using multi-objective genetic algorithm for partner selection in green supply chain problems (2010)
this work references cited by second hop

References

  • 1986Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction1,161 cited
  • 1986Economic Production Cycles with Imperfect Production Processes1,049 cited
  • 1992Production Lot Sizing with Machine Breakdowns271 cited
  • 2002An optimal production run time with imperfect production processes and allowable shortages155 cited
  • 1999An optimal production run length in deteriorating production processes142 cited
  • 2002Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process129 cited
  • 2006Optimal batch sizing in a multi-stage production system with rework consideration128 cited
  • 1998Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions87 cited
  • 1995Joint investment in quality improvement and setup reduction65 cited
  • 1999Analysis of a production–inventory system with machine breakdowns and shutdowns53 cited
  • 2006Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages51 cited
  • 1988Justifying New Technology Acquisition Through its Impact on the Cost of Running an Inventory Policy45 cited
  • 1999Optimal two-stage lot sizing and inventory batching policies37 cited
  • 2006Effect of inspection errors and preventive maintenance on a two-stage production inventory system

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

31 cited
  • 1983Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems27 cited
  • Cited by

    No citing works inside the corpus for this window.