SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Quality control of an unreliable random FMS: with Bernoulli and CSP sampling
13 references·1 citing·27 second hop
Quality control of an unreliable random FMS: with Bernoulli and CSP sampling (1988)Quality control of an unreliable random F…Jobshop-Like Queueing Systems (2004)Jobshop-Like Queueing SystemsQuality control of the M/M/1 queue (1987)Quality control of the M/M/1 …On queueing network models of flexible manufacturing systems (1986)On queueing network models of…Performance evaluation of flexible manufacturing systems (1984)Performance evaluation of fle…The Queueing Network Analyzer (1983)The Queueing Network AnalyzerOpen queueing network models of dynamic job shops (1981)Open queueing network models …Additional Continuous Sampling Inspection Plans (1977)Additional Continuous Samplin…Quality Control and Industrial Statistics. (1975)Quality Control and Industria…Quality Control and Industrial Statistics. (1967)Quality Control and Industria…Jobshop-Like Queueing Systems (1963)Jobshop-Like Queueing SystemsNetworks of Waiting Lines (1957)Networks of Waiting LinesIndustrial Quality Control. (1946)Industrial Quality Control.A Sampling Inspection Plan for Continuous Production (1943)A Sampling Inspection Plan fo…Approximate performance modeling and decision making for manufacturing systems: A queueing network optimization framework (1991)Approximate performance model…Open, Closed, and Mixed Networks of Queues with Different Classes of Customers (1975)The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues (1985)Queueing theory in manufacturing: A survey (1999)Reverse logistics network design with stochastic lead times (2005)Optimal one-sided shewhart control charts with variable sampling intervals (1989)Cost of quality: Evaluating cost-quality trade-offs for inspection strategies of manufacturing processes (2017)The Operational Analysis of Queueing Network Models (1978)Lot Sizes, Lead Times and In-Process Inventories (1987)Inventory Management of Remanufacturable Products (2000)Evaluating Flexible Manufacturing Systems (1987)Applications of the Analytic Hierarchy Process: A Categorized, Annotated Bibliography (1989)Investigating the Effect of Normalization Norms in Flexible Manufacturing Sytem Se-lection Using Multi - Criteria Decision - Making Methods (2014)Closed Queuing Systems with Exponential Servers (1967)Open Queueing Networks in Heavy Traffic (1984)Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods (1988)New results on the single server queue with a batch markovian arrival process (1991)A Cusum for a Scale Parameter (1981)Economic Selection of Quality Manufactured Product (1984)A Bayesian Approach to the ICH Q8 Definition of Design Space (2008)Statistical Quality Control (1990)Kollár Ádám Ferenc levelezése (2000)Exploratory Data Mining and Data Cleaning (2003)Adaptive Sampling for Process Control (1991)Management and Theories of Organizations in the 1990s: Toward a Critical Radical Humanism? (1992)Repetitive group sampling procedure for variables inspection (2006)Computational algorithms for closed queueing networks with exponential servers (1973)An introduction to queueing theory (1993)
this work references cited by second hop

References

  • 1957Networks of Waiting Lines1,215 cited
  • 1983The Queueing Network Analyzer1,034 cited
  • 1967Quality Control and Industrial Statistics.1,001 cited
  • 1963Jobshop-Like Queueing Systems898 cited
  • 2004Jobshop-Like Queueing Systems733 cited
  • 1975Quality Control and Industrial Statistics.358 cited
  • 1943A Sampling Inspection Plan for Continuous Production281 cited
  • 1981Open queueing network models of dynamic job shops172 cited
  • 1946Industrial Quality Control.157 cited
  • 1984Performance evaluation of flexible manufacturing systems115 cited
  • 1986On queueing network models of flexible manufacturing systems110 cited
  • 1977Additional Continuous Sampling Inspection Plans64 cited
  • 1987Quality control of the M/M/1 queue30 cited

Cited by

  • 1991Approximate performance modeling and decision making for manufacturing systems: A queueing network optimization framework25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work