SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Factors influencing the selection of delay analysis methodologies
16 references·3 citing·33 second hop
Factors influencing the selection of delay analysis methodologies (2007)Factors influencing the selection of dela…An Introduction to Research Methods (2019)An Introduction to Research M…Research methods for managers (2018)Research methods for managersDesigning and conducting survey research (2016)Designing and conducting surv…Research Methods for Managers (2012)Research Methods for ManagersSelecting a delay analysis method in resolving construction claims (2005)Selecting a delay analysis me…Project Management in Construction: Software Use and Research Directions (2001)Project Management in Constru…AN INTRODUCTION TO RESEARCH METHODS (2000)AN INTRODUCTION TO RESEARCH M…Mixed Methodology: Combining Qualitative and Quantitative Approaches (1999)Mixed Methodology: Combining …Comparison of Delay Analysis Methodologies (1998)Comparison of Delay Analysis …Project complexity: The focal point of construction production planning (1996)Project complexity: The focal…Construction delay analysis techniques (1996)Construction delay analysis t…Factor analysis and related techniques (1994)Factor analysis and related t…Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Construction Claims and Dispu…Construction Delay Claims (1987)Construction Delay ClaimsConstruction Claims: Frequency and Severity (1985)Construction Claims: Frequenc…Introduction to Factor Analysis: What It Is and How to Do It. (1980)Introduction to Factor Analys…An Overarching Review on Delay Analyses in Construction Projects (2021)An Overarching Review on Dela…Improved project control for sustainable development of construction sector to reduce environment risks (2019)Improved project control for …Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects (2016)Decision-Making Model for Sel…A Task Contingent Model of Work-Unit Structure (1974)Journal of Construction Engineering and Management (1983)The Management of Innovation (1994)Interdependence in supply chains and projects in construction (2010)The logic of innovation in construction (2014)Clarifying the project complexity construct: Past, present and future (2016)The dual imperatives of action research (2001)Research dilemmas: Paradigms, methods and methodology (2006)Research focus and methodological choices in studies into students' experiences of blended learning in higher education (2007)Quantitative and qualitative research in the built environment: application of “mixed” research approach (2002)How to research (2010)Research Methods in Business Studies (2020)Using Mixed-Methods Sequential Explanatory Design: From Theory to Practice (2005)Integrating quantitative and qualitative research: how is it done? (2006)Improving Impact Studies of Teachers’ Professional Development: Toward Better Conceptualizations and Measures (2009)Conflict and dispute in construction (1997)Conflicts, claims and disputes in construction (1997)Construction Project Cost Escalation Factors (2009)Perceptions of the school psychological environment and early adolescents' psychological and behavioral functioning in school: The mediating role of goals and belonging. (1996)Handbook on Constructing Composite Indicators (2005)Handbook on Constructing Composite Indicators: Methodology and User Guide (2008)Classroom-level curriculum development: EFL teachers as curriculum-developers, curriculum-makers and curriculum-transmitters (2009)Confucian values and school leadership in Vietnam (2016)Sensitive Interviewing in Qualitative Research (2016)New Teachers' Experiences of Hiring: Late, Rushed, and Information-Poor (2006)New teachers’ experiences of mentoring: The good, the bad, and the inequity (2008)Evaluating the level of stakeholder involvement during the project planning processes of building projects (2015)Circular economy indicators for organizations considering sustainability and business models: Plastic, textile and electro-electronic cases (2019)WSEAS TRANSACTIONS ON ENVIRONMENT AND DEVELOPMENT (2020)Teknik Pengambilan Sampel Umum dalam Metodologi Penelitian: Literature Review (2022)Redefining performance measures for construction project managers: an empirical evaluation (2003)Competency-Based Model for Predicting Construction Project Managers’ Performance (2004)Understanding the Motivations and Satisfactions of Volunteers to Improve the Effectiveness of Citizen Science Programs (2015)
this work references cited by second hop

References

  • 1999Mixed Methodology: Combining Qualitative and Quantitative Approaches5,204 cited
  • 2019An Introduction to Research Methods2,362 cited
  • 2012Research Methods for Managers1,431 cited
  • 1980Introduction to Factor Analysis: What It Is and How to Do It.1,186 cited
  • 2018Research methods for managers859 cited
  • 2000AN INTRODUCTION TO RESEARCH METHODS716 cited
  • 2016Designing and conducting survey research427 cited
  • 1996Project complexity: The focal point of construction production planning295 cited
  • 1994Construction Claims and Disputes: Causes and Cost/Time Overruns287 cited
  • 1994Factor analysis and related techniques237 cited
  • 2005Selecting a delay analysis method in resolving construction claims212 cited
  • 1996Construction delay analysis techniques160 cited
  • 1985Construction Claims: Frequency and Severity138 cited
  • 2001Project Management in Construction: Software Use and Research Directions133 cited
  • 1987Construction Delay Claims126 cited
  • 1998Comparison of Delay Analysis Methodologies122 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Cited by

  • 2021An Overarching Review on Delay Analyses in Construction Projects66 cited
  • 2016Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects46 cited
  • 2019Improved project control for sustainable development of construction sector to reduce environment risks44 cited