SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Letter to the Editor—The PERT Model for the Distribution of an Activity Time
1 references·16 citing·43 second hop
Letter to the Editor—The PERT Model for the Distribution of an Activity Time (1962)Letter to the Editor—The PERT Model for t…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…Practical crash duration estimation for project schedule activities (2019)Practical crash duration esti…M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics (2017)M-PERT: Manual Project-Durati…Sensitivity analysis in PERT networks: Does activity duration distribution matter? (2016)Sensitivity analysis in PERT …Potential of trans fats policies to reduce socioeconomic inequalities in mortality from coronary heart disease in England: cost effectiveness modelling study (2015)Potential of trans fats polic…A fuzzy stochastic multi-criteria model for the selection of urban pervious pavements (2014)A fuzzy stochastic multi-crit…Effects of the application of activity calendars on the distribution of project duration in PERT networks (2013)Effects of the application of…PERT 21: Fitting PERT/CPM for use in the 21st century (2011)PERT 21: Fitting PERT/CPM for…Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation (2011)Modeling activity times by th…Mixture densities for project management activity times: A robust approach to PERT (2007)Mixture densities for project…A review of the contribution of Operational Research to Project Management (2002)A review of the contribution …Use of fuzzy numbers in project risk (criticality) assessment (2001)Use of fuzzy numbers in proje…An approximation of the activity duration distribution in PERT (2001)An approximation of the activ…The risk of delay of a project in terms of the morphology of its network (1999)The risk of delay of a projec…Simplified Program Evaluation and Review Technique (PERT) (1999)Simplified Program Evaluation…New validations of PERT times (1997)New validations of PERT timesAnother Look at the PERT Assumptions (1973)Another Look at the PERT Assu…Fuzzy sets (1965)How to make a decision: The analytic hierarchy process (1990)Fuzzy sets (1996)Intuitionistic fuzzy divergence measure-based ELECTRE method for performance of cellular mobile telephone service providers (2018)A Review of Multicriteria Assessment Techniques Applied to Sustainable Infrastructure Design (2019)A systematic review on MIVES: A sustainability-oriented multi-criteria decision-making method (2022)An Analytical Study of the PERT Assumptions (1964)Probability, statistics, and decision for civil engineers (1970)Project scheduling and monitoring: current research status (2004)Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling (2012)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management. Tasks, Responsibilities, Practices. (1975)The New Science of Management Decision (1978)Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach (2009)Total Cost Control in Project Management via Satisficing (2013)Inter‐phase feedbacks in construction projects (2015)Network analysis for planning and scheduling (1970)Activity networks: Project planning and control by network models (1977)A random generator of resource-constrained multi-project network problems (2009)Robust Project Scheduling (2009)A project scheduling approach to production planning with feeding precedence relations (2010)The Variation of Certain Speculative Prices (1963)The Behavior of Stock-Market Prices (1965)Autoregressive Conditional Heteroscedasticity with Estimates of the Variance of United Kingdom Inflation (1982)Setting tolerance limits for statistical project control using earned value management (2014)Adjustable robustness for multi-attribute project portfolio selection (2016)Judgment under Uncertainty: Heuristics and Biases (1974)Judgment under Uncertainty: Heuristics and Biases (1975)Project scheduling under uncertainty: Survey and research potentials (2004)Improved Critical Chain Project Management Framework for Scheduling Construction Projects (2014)Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Maximizing the net present value of a project under uncertainty (2009)Judgment under Uncertainty (2017)Who Global Strategy on Diet, Physical Activity and Health (2004)The English Indices of Deprivation 2010 (2011)English Indices of Deprivation (2013)An evaluation of a public–private partnership to reduce artificial trans fatty acids in England, 2011–16 (2017)A heuristic method for RCPSP with fuzzy activity times (2010)Two Schools of Risk Analysis: A Review of past Research on Project Risk (2011)Modeling project criticality in IT project portfolios (2018)Critical-path planning and scheduling (1959)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)
this work references cited by second hop

References

  • 1959Application of a Technique for Research and Development Program Evaluation932 cited

Cited by

  • 2002A review of the contribution of Operational Research to Project Management113 cited
  • 2011Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation108 cited
  • 2011PERT 21: Fitting PERT/CPM for use in the 21st century104 cited
  • 2001Use of fuzzy numbers in project risk (criticality) assessment103 cited
  • 2007Mixture densities for project management activity times: A robust approach to PERT101 cited
  • 2014A fuzzy stochastic multi-criteria model for the selection of urban pervious pavements98 cited
  • 1999Simplified Program Evaluation and Review Technique (PERT)89 cited
  • 1999The risk of delay of a project in terms of the morphology of its network67 cited
  • 2015Potential of trans fats policies to reduce socioeconomic inequalities in mortality from coronary heart disease in England: cost effectiveness modelling study65 cited
  • 2001An approximation of the activity duration distribution in PERT65 cited
  • 2016Sensitivity analysis in PERT networks: Does activity duration distribution matter?60 cited
  • 2017M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics59 cited
  • 1973Another Look at the PERT Assumptions

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

57 cited
  • 2013Effects of the application of activity calendars on the distribution of project duration in PERT networks52 cited
  • 1997New validations of PERT times51 cited
  • 2019Practical crash duration estimation for project schedule activities49 cited