SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al.
8 references·5 citing·30 second hop
A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. (2001)A note on the paper “Resource-constrained…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Heuristic Algorithms for the …A Classification Scheme for Project Scheduling (1999)A Classification Scheme for P…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …Resource-constrained multi-project management, a hierarchical decision support system (1998)Resource-constrained multi-pr…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…GERT Networks and the Time-Oriented Evaluation of Projects (1979)GERT Networks and the Time-Or…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…An effective genetic algorithm for the resource levelling problem with generalised precedence relations (2017)An effective genetic algorith…An approach using SAT solvers for the RCPSP with logical constraints (2015)An approach using SAT solvers…Planning and design models for construction industry: A critical survey (2011)Planning and design models fo…Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (2007)Evolutionary algorithms appli…Proactive-Reactive Project Scheduling Trade-Offs and Procedures (2006)Proactive-Reactive Project Sc…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Ant colony optimization for resource-constrained project scheduling (2002)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Bees Algorithm for multi-mode, resource-constrained project scheduling in molding industry (2017)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Project Management With Cpm, Pert and Precedence Diagramming (1983)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Project Scheduling—Theory and Practice (2005)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Competitive Strategy: Techniques for Analyzing Industries and Competitors (1980)Dynamic order acceptance and capacity planning on a single bottleneck resource (2007)GRASP and path relinking for project scheduling under partially renewable resources (2007)Design and Analysis of Experiments (2007)Journal of Industrial Engineering (2017)A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs (2019)Dynamic resource levelling in projects under uncertainty (2020)Resource-constrained multi-project scheduling with activity and time flexibility (2020)An Approach to the Modeling and Analysis of Software Production Processes (1995)Visual Dependency Structure Matrix for Multidisciplinary Design Optimization Tradeoff Studies (2008)An integrated survey of deterministic project scheduling (2001)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A Constraint-Based Method for Project Scheduling with Time Windows (2002)
this work references cited by second hop

References

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 1999Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis526 cited
  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1999A Classification Scheme for Project Scheduling195 cited
  • 1979GERT Networks and the Time-Oriented Evaluation of Projects63 cited
  • 1998Resource-constrained multi-project management, a hierarchical decision support system52 cited

Cited by

  • 2017An effective genetic algorithm for the resource levelling problem with generalised precedence relations47 cited
  • 2007Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art42 cited
  • 2011Planning and design models for construction industry: A critical survey41 cited
  • 2006Proactive-Reactive Project Scheduling Trade-Offs and Procedures38 cited
  • 2015An approach using SAT solvers for the RCPSP with logical constraints38 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work