SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Contractors' Claim Process Framework
4 references·14 citing·45 second hop
Construction Contractors' Claim Process Framework (2001)Construction Contractors' Claim Process F…Modern Construction Management (2012)Modern Construction ManagementDevelopment of a Technical Innovation Audit (1996)Development of a Technical In…How the Baldrige Award really works. (1992)How the Baldrige Award really…Marketing Research: Methodological Foundations (1977)Marketing Research: Methodolo…Performance Indicators for the Claim Management of General Contractors (2020)Performance Indicators for th…Methods for Modeling and Evaluating Construction Disputes: A Critical Review (2020)Methods for Modeling and Eval…Development of Prediction Models for Claim Cause Analyses in Highway Projects (2019)Development of Prediction Mod…A process reference model for claims management in construction supply chains: the contractors’ perspective (2018)A process reference model for…Measuring Project Management Performance: Case of Construction Industry (2017)Measuring Project Management …Causes of contractors’ claims in international engineering-procurement-construction projects (2017)Causes of contractors’ claims…PROPOSING A NEURAL NETWORK MODEL TO PREDICT TIME AND COST CLAIMS IN CONSTRUCTION PROJECTS (2016)PROPOSING A NEURAL NETWORK MO…Construction Bidding and the Winner’s Curse: Game Theory Approach (2015)Construction Bidding and the …A Study of Construction Claim Management Problems in Malaysia (2015)A Study of Construction Claim…A labor consumption measurement system based on real-time tracking technology for dam construction site (2015)A labor consumption measureme…METHODS FOR SELECTING THE BEST PARTNER CONSTRUCTION ENTERPRISE IN TERMS OF PARTNERING RELATIONS (2010)METHODS FOR SELECTING THE BES…Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery (2010)Contractor’s decision for bid…Construction project procurement routes: an in‐depth critique (2009)Construction project procurem…Cost Impacts, Scheduling Impacts, and the Claims Process during Construction (2004)Cost Impacts, Scheduling Impa…The Bargaining Problem (1950)The Hubris Hypothesis of Corporate Takeovers (1986)Game theory: analysis of conflict (1992)Does the Planning Fallacy Prevail in Social Infrastructure Projects? Empirical Evidence and Competing Explanations (2019)Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach (2021)Relaxed Rank Order Centroid Weighting MCDM Method With Improved Grey Relational Analysis for Subcontractor Selection: Photothermal Power Station Construction (2022)An audit of technological innovation capabilities in chinese firms: some empirical findings in Beijing, China (2004)Relationships between innovation stimulus, innovation capacity, and innovation performance (2006)The Core Competence of the Corporation (2006)The Sources of Innovation (2007)The Economics of Industrial Innovation (2012)Innovation indicators throughout the innovation process: An extensive literature analysis (2018)An Introduction to Building Procurement Systems (2003)Environmental factors and work performance of project managers in the construction industry (2005)Making Projects Critical (2006)Supply chain sustainability – a relationship management approach (2011)The principal factors affecting construction project overhead expenses: an exploratory factor analysis approach (2012)Procurement and innovation risk management: How a public client managed to realize a radical green innovation in a civil engineering project (2022)Model for Understanding, Preventing, and Resolving Project Disputes (2001)Selecting a delay analysis method in resolving construction claims (2005)Determination of Disproportionate Tenders in Public Procurement (2013)Evolutionary game of investors’ opportunistic behaviour during the operational period in PPP projects (2016)Do public–private partnerships achieve better time and cost performance than regular contracts? (2020)Evaluating Structural Equation Models with Unobservable Variables and Measurement Error (1981)Structural equation modeling in practice: A review and recommended two-step approach. (1988)Alternative Ways of Assessing Model Fit (1992)Addressing Legal and Contractual Matters in Construction Using Natural Language Processing: A Critical Review (2021)Ambiguity factors in construction contracts entailing conflicts (2021)Comparative fit indexes in structural models. (1990)Principles and Practice of Structural Equation Modeling (1998)The Effect of Stakeholder-Associated Risks in Mega-Engineering Projects: A Case Study of a PPP Airport Project (2018)Mediating Role of Trust Between Leader Communication Style and Subordinate’s Work Outcomes in Project Teams (2020)AHP based multi criteria decision analysis of success factors to enhance decision making in infrastructure construction projects (2022)Generic Methodology for Analyzing Delay Claims (1999)Analytical Model for Analyzing Construction Claims and Opportunistic Bidding (2004)Construction claims in United Arab Emirates: Types, causes, and frequency (2006)Contributors to construction delays (1998)Which contractor selection methodology? (1998)Governmental role in BOT-led infrastructure development (2001)Beyond Accuracy: What Data Quality Means to Data Consumers (1996)The Impact of Technostress on Role Stress and Productivity (2007)Evaluation of Structural Equation Models Using the Partial Least Squares (PLS) Approach (2009)Further evidence on the validity of the theoretical models underlying the Baldrige criteria (2001)ISO 9000 practices and financial performance: A technology coherence perspective (2007)How integrated are environmental, quality and other standardized management systems? An empirical study (2008)
this work references cited by second hop

References

  • 1977Marketing Research: Methodological Foundations4,351 cited
  • 1996Development of a Technical Innovation Audit711 cited
  • 1992How the Baldrige Award really works.388 cited
  • 2012Modern Construction Management314 cited

Cited by

  • 2017Causes of contractors’ claims in international engineering-procurement-construction projects113 cited
  • 2015Construction Bidding and the Winner’s Curse: Game Theory Approach103 cited
  • 2017Measuring Project Management Performance: Case of Construction Industry94 cited
  • 2010Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery89 cited
  • 2009Construction project procurement routes: an in‐depth critique85 cited
  • 2015A Study of Construction Claim Management Problems in Malaysia74 cited
  • 2020Methods for Modeling and Evaluating Construction Disputes: A Critical Review70 cited
  • 2019Development of Prediction Models for Claim Cause Analyses in Highway Projects68 cited
  • 2016PROPOSING A NEURAL NETWORK MODEL TO PREDICT TIME AND COST CLAIMS IN CONSTRUCTION PROJECTS54 cited
  • 2004Cost Impacts, Scheduling Impacts, and the Claims Process during Construction53 cited
  • 2018

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

A process reference model for claims management in construction supply chains: the contractors’ perspective
52 cited
  • 2020Performance Indicators for the Claim Management of General Contractors45 cited
  • 2015A labor consumption measurement system based on real-time tracking technology for dam construction site44 cited
  • 2010METHODS FOR SELECTING THE BEST PARTNER CONSTRUCTION ENTERPRISE IN TERMS OF PARTNERING RELATIONS41 cited