SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Distribution requirements and compactness constraints in school timetabling
16 references·2 citing·31 second hop
Distribution requirements and compactness constraints in school timetabling (1997)Distribution requirements and compactness…Project Scheduling Under Partially Renewable Resource Constraints (1999)Project Scheduling Under Part…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes (1995)Project Scheduling under Reso…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…A tabu search algorithm for computing an operational timetable (1994)A tabu search algorithm for c…Genetic Algorithms: A New Approach to the Timetable Problem (1992)Genetic Algorithms: A New App…Finding a feasible course schedule using Tabu search (1992)Finding a feasible course sch…Tabu search for large scale timetabling problems (1991)Tabu search for large scale t…Scheduling of Project Networks by Job Assignment (1991)Scheduling of Project Network…Constructing School Timetables Using Simulated Annealing: Sequential and Parallel Algorithms (1991)Constructing School Timetable…OR Practice—An Efficient Decision Support System for Academic Course Scheduling (1989)OR Practice—An Efficient Deci…A large scale timetabling problem (1989)A large scale timetabling pro…Timetabling in Germany—A Survey (1986)Timetabling in Germany—A Surv…Timetabling problem for university as assignment of activities to resources (1985)Timetabling problem for unive…An introduction to timetabling (1985)An introduction to timetablingA classroom/time assignment model (1982)A classroom/time assignment m…A grasp-knapsack hybrid for a nurse-scheduling problem (2007)A grasp-knapsack hybrid for a…Artificial immune system based approach for solving resource constraint project scheduling problem (2006)Artificial immune system base…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Scheduling the professional soccer leagues of Austria and Germany (2004)Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (2006)Extensions of the resource-constrained project scheduling problem (2023)OR Practice—A Survey of Practical Applications of Examination Timetabling Algorithms (1986)Automated University Timetabling: The State of the Art (1997)A robust simulated annealing based examination timetabling system (1998)A time-predefined local search approach to exam timetabling problems (2004)Activity networks: Project planning and control by network models (1977)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING (1993)Decision support for disaster management (2010)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (2007)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)Metaheuristics for High School Timetabling (1998)Design and implementation of a course scheduling system using Tabu Search (2002)Design, engineering, and experimental analysis of a simulated annealing approach to the post-enrolment course timetabling problem (2011)Recent research directions in automated timetabling (2002)A survey of metaheuristic-based techniques for University Timetabling problems (2007)A survey of search methodologies and automated system development for examination timetabling (2008)A competitive genetic algorithm for resource-constrained project scheduling (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Local search techniques for large high school timetabling problems (1999)Efficient solutions for a university timetabling problem through integer programming (2003)Operational Research in education (2014)Applying simulated annealing to location-planning models (1996)Recent developments in practical course timetabling (1998)A harmony search algorithm for university course timetabling (2010)Resource-constrained project scheduling: A survey of recent developments (1998)
this work references cited by second hop

References

  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1985An introduction to timetabling581 cited
  • 1991Constructing School Timetables Using Simulated Annealing: Sequential and Parallel Algorithms290 cited
  • 1991Tabu search for large scale timetabling problems209 cited
  • 1994A tabu search algorithm for computing an operational timetable168 cited
  • 1991Scheduling of Project Networks by Job Assignment162 cited
  • 1995Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes157 cited
  • 1992Finding a feasible course schedule using Tabu search116 cited
  • 1999Project Scheduling Under Partially Renewable Resource Constraints94 cited
  • 1982A classroom/time assignment model73 cited
  • 1989A large scale timetabling problem72 cited
  • 1992Genetic Algorithms: A New Approach to the Timetable Problem69 cited
  • 1989OR Practice—An Efficient Decision Support System for Academic Course Scheduling67 cited
  • 1985Timetabling problem for university as assignment of activities to resources

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

57 cited
  • 1986Timetabling in Germany—A Survey52 cited
  • Cited by

    • 2006Artificial immune system based approach for solving resource constraint project scheduling problem51 cited
    • 2007A grasp-knapsack hybrid for a nurse-scheduling problem45 cited