A survey on the resource-constrained project scheduling problem
7 references·16 citing·29 second hop
A survey on the resource-constrained project scheduling problem (1995)A survey on the resource-constrained proj…Journal of Industrial Engineering (2017)Journal of Industrial Enginee…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)An updated survey of variants…Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler (2012)Ant Colony Optimization for S…Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Resource-constrained multi-pr…Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Project scheduling with finit…A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)A Decomposition-Based Genetic…A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem (2006)A Branch-and-Cut Procedure fo…Project Scheduling—Theory and Practice (2005)Project Scheduling—Theory and…Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Simulated annealing and tabu …Justification and RCPSP: A technique that pays (2004)Justification and RCPSP: A te…A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)A hybrid scatter search/elect…RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)RanGen: A Random Network Gene…A self‐adapting genetic algorithm for project scheduling under resource constraints (2002)A self‐adapting genetic algor…A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)A Competitive Heuristic Solut…A multicriteria heuristic method to improve resource allocation in multiproject scheduling (2000)A multicriteria heuristic met…A Classification Scheme for Project Scheduling (1999)A Classification Scheme for P…Project network models with discounted cash flows a guided tour through recent developments (1997)Project network models with d…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A hybrid genetic algorithm for the resource-constrained project scheduling problem (2007)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Resource-constrained project scheduling: A survey of recent developments (1998)The use of buffers in project management: The trade-off between stability and makespan (2004)An evaluation of the adequacy of project network generators with systematically sampled networks (2007)Activity networks: Project planning and control by network models (1977)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Application of a Technique for Research and Development Program Evaluation (1959)Robust and reactive project scheduling: a review and classification of procedures (2004)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (2022)Resource-constrained multi-project scheduling problem: A survey (2022)Extensions of the resource-constrained project scheduling problem (2023)A competitive genetic algorithm for resource-constrained project scheduling (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Efficient priority rules for the resource‐constrained project scheduling problem (1996)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)The Economic Design of Control Charts: A Review and Literature Survey (1980)Treating Progress Functions as a Managerial Opportunity (1984)Revised NIOSH equation for the design and evaluation of manual lifting tasks (1993)
this work references cited by second hop

References

  • 2017Journal of Industrial Engineering1,623 cited
  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited

Cited by

  • 2021An updated survey of variants and extensions of the resource-constrained project scheduling problem316 cited
  • 2004A hybrid scatter search/electromagnetism meta-heuristic for project scheduling307 cited
  • 2003RanGen: A Random Network Generator for Activity-on-the-Node Networks298 cited
  • 2010Project scheduling with finite or infinite number of activity processing modes – A survey282 cited
  • 2002A self‐adapting genetic algorithm for project scheduling under resource constraints268 cited
  • 2004Justification and RCPSP: A technique that pays266 cited
  • 2010Resource-constrained multi-project scheduling: Priority rule performance revisited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

263 cited
  • 1999A Classification Scheme for Project Scheduling195 cited
  • 2007A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem192 cited
  • 2005Project Scheduling—Theory and Practice187 cited
  • 2012Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler180 cited
  • 2004Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models174 cited
  • 1997Project network models with discounted cash flows a guided tour through recent developments173 cited
  • 2001A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling168 cited
  • 2000A multicriteria heuristic method to improve resource allocation in multiproject scheduling166 cited
  • 2006A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem163 cited