SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Multiobjective simulation optimisation in software project management
5 references·0 citing·25 second hopsampled
Multiobjective simulation optimisation in software project management (2011)Multiobjective simulation optimisation in…How to build valid and credible simulation models (2009)How to build valid and credib…How to build valid and credible simulation models (2008)How to build valid and credib…Software project management with GAs (2007)Software project management w…Advances in analytics: Integrating dynamic data mining with simulation optimization (2007)Advances in analytics: Integr…A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects (2004)A multiobjective evolutionary…Multiple Criteria Decision Making (1983)Multicriteria Decision-Aid. (1993)Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys (2002)Project scheduling with flexible resources: formulation and inequalities (2010)Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem (2012)A review on optimisation of part quality inspection planning in a multi-stage manufacturing system (2018)A New Approach to Consumer Theory (1976)Multi-agent enabled modeling and simulation towards collaborative inventory management in supply chains (2002)Analysis of internal logistic systems based on event logs (2010)Modeling and Simulation (2018)Optimising enterprise resource planning system to leverage a firm’s absorptive and adaptive capabilities (2019)Simulation-based analytics: A systematic literature review (2022)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Ant colony optimization for resource-constrained project scheduling (2002)Scheduling and staffing multiple projects with a multi-skilled workforce (2009)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler (2012)Design and Analysis of Experiments. (1978)Simulation Modeling and Analysis. (1983)Warnings about simulation (2010)Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Simulation-Based Research in Information Systems (2018)Discrete Event System Simulation (2024)Design and Analysis of Experiments (2006)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 2007Software project management with GAs268 cited
  • 2008How to build valid and credible simulation models135 cited
  • 2009How to build valid and credible simulation models96 cited
  • 2004A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects71 cited
  • 2007Advances in analytics: Integrating dynamic data mining with simulation optimization58 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work