A systematic approach to the selection of an appropriate crane for a construction site
0 references·8 citing·26 second hop
A systematic approach to the selection of an appropriate crane for a construction site (1985)A systematic approach to the selection of…A system boundary-based critical review on crane selection in building construction (2020)A system boundary-based criti…“Soft” Considerations in Equipment Selection for Building Construction Projects (2007)“Soft” Considerations in Equi…Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method (2004)Selection of Concrete Pump Us…ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators (2003)ELECTRE III in evaluating per…Nonlinear Models for Predicting Hoisting Times of Tower Cranes (2002)Nonlinear Models for Predicti…Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes (2001)Comparative study of artifici…Computer‐Aided Equipment Selection for Transporting and Placing Concrete (1993)Computer‐Aided Equipment Sele…‘Intelligent’ construction time and cost analysis (1986)‘Intelligent’ construction ti…Construction Labor Productivity Modeling with Neural Networks (1998)Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Regularization Neural Network for Construction Cost Estimation (1998)AN ARTIFICIAL NEURAL NETWORKS MODEL FOR THE ESTIMATION OF FORMWORK LABOUR / DIRBTINIŲ NEURONINIŲ TINKLŲ MODELIS, KURIO PASKIRTIS – SKAIČIUOTI KLOJINIAMS SKIRTO DARBO APIMTIS (2011)Artificial Neural Networks for Construction Management: A Review (2017)Crane overlap and operational flexibility: balancing utilization, duration, and safety (2017)The Rational manager: a systematic approach to problem solving and decision Making (1965)The analytic hierarchy process : planning, priority setting, resource allocation (1980)Multi-Criteria Decision Making (MCDM) techniques in planning (1988)Location Optimization for a Group of Tower Cranes (1999)AHP-Based Equipment Selection Model for Construction Projects (2005)Modern Construction Management (2012)Survey of quantitative methods in construction (2017)Covering polygons with discs: The problem of crane selection and location on construction sites (2019)Factors Affecting Masonry‐Labor Productivity (1991)Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Forecasting technique familiarity, satisfaction, usage, and application (1995)Hybrid Expert System for Construction Planning and Scheduling (1990)Expert System for Equipment Selection for Earth‐Moving Operations (1992)Patterns of Discovery in the Social Sciences. (1973)Construction Planning—Beyond the Critical Path (1980)How to select and how to rank projects: The Promethee method (1986)Remarks on the Analytic Hierarchy Process (1990)General System Theory: Foundations, Development, Applications (1977)What is the Analytic Hierarchy Process? (1988)Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems (2007)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2001Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes54 cited
  • 2002Nonlinear Models for Predicting Hoisting Times of Tower Cranes44 cited
  • 2004Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method43 cited
  • 2007“Soft” Considerations in Equipment Selection for Building Construction Projects42 cited
  • 2020A system boundary-based critical review on crane selection in building construction39 cited
  • 2003ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators32 cited
  • 1986‘Intelligent’ construction time and cost analysis31 cited
  • 1993Computer‐Aided Equipment Selection for Transporting and Placing Concrete18 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work