SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Precedence diagramming method: Some unusual characteristics and their implications for project managers
2 references·8 citing·37 second hop
Precedence diagramming method: Some unusual characteristics and their implications for project managers (1981)Precedence diagramming method: Some unusu…Management Guide to PERT/CPM (1969)Management Guide to PERT/CPMA NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)A NON-COMPUTER APPROACH TO TH…Modeling project criticality in IT project portfolios (2018)Modeling project criticality …Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic (2016)Simulating Uncertainties in C…The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations (2015)The Fuzzy Project Scheduling …Exact algorithm for matrix-based project planning problems (2015)Exact algorithm for matrix-ba…Combining contemporary and traditional project management tools to resolve a project scheduling problem (2010)Combining contemporary and tr…Transform Schemes Applied on Non-Finish-to-Start Logical Relationships in Project Network Diagrams (2009)Transform Schemes Applied on …Computing latest starting times of activities in interval-valued networks with minimal time lags (2009)Computing latest starting tim…An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (1998)An optimal procedure for the …Fuzzy Sets and Systems - Theory and Applications (1980)Handbooks in operations research and management science (1989)A guide to the project management body of knowledge (PMBOK guide) (2004)A model-based method for organizing tasks in product development (1994)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Product Development Decisions: A Review of the Literature (2001)Hybrid time-quality-cost trade-off problems (2018)Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules (2019)ICCP: A heuristic process planning method for personalized product configuration design (2023)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A genetic algorithm-based optimizing approach for project time-cost trade-off with uncertain measure (2014)Modeling project time–cost trade-off in fuzzy random environment (2014)Impact of work–life balance with the role of organizational support and job burnout on project performance (2021)Project management with CPM and PERT (1965)Project Management: Techniques in Planning and Controlling Construction Projects (1984)Resource-constrained project scheduling: A survey of recent developments (1998)Fuzzy sets (1965)PSPLIB - A project scheduling problem library (1997)Project scheduling under uncertainty: Survey and research potentials (2004)Crew Allocation System for the Masonry Industry (2017)Introduction to simulation and SLAM II (1979)A Model-Based Framework to Overlap Product Development Activities (1997)PORTFOLIO SELECTION* (1952)Judgment under Uncertainty: Heuristics and Biases (1974)Judgment under Uncertainty: Heuristics and Biases (1975)A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection (2020)Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control (2021)Project Portfolio Network Risk Propagation Modeling: A Risk Perception Perspective (2024)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Project management with time, cost, and quality considerations (1996)Resource-Activity Critical-Path Method for Construction Planning (2003)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A review of methods and algorithms for optimizing construction scheduling (2013)
this work references cited by second hop

References

  • 1969Management Guide to PERT/CPM304 cited
  • 1962A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY157 cited

Cited by

  • 2018Modeling project criticality in IT project portfolios63 cited
  • 2015Exact algorithm for matrix-based project planning problems43 cited
  • 2009Computing latest starting times of activities in interval-valued networks with minimal time lags41 cited
  • 2010Combining contemporary and traditional project management tools to resolve a project scheduling problem38 cited
  • 1998An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations37 cited
  • 2015The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations32 cited
  • 2016Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic32 cited
  • 2009Transform Schemes Applied on Non-Finish-to-Start Logical Relationships in Project Network Diagrams32 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work