GRASP and path relinking for project scheduling under partially renewable resources
10 references·2 citing·39 second hop
GRASP and path relinking for project scheduling under partially renewable resources (2007)GRASP and path relinking for project sche…Project Scheduling with Time Windows and Scarce Resources (2003)Project Scheduling with Time …Project Scheduling: A Research Handbook (2002)Project Scheduling: A Researc…Project Scheduling with Time Windows (2002)Project Scheduling with Time …ProGen/πx – An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions (2000)ProGen/πx – An instance gener…Project Scheduling Under Partially Renewable Resource Constraints (1999)Project Scheduling Under Part…Resource-constrained multi-project management, a hierarchical decision support system (1998)Resource-constrained multi-pr…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…Management Guide to PERT/CPM (1969)Management Guide to PERT/CPMCritical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Project scheduling under partially renewable resources and resource consumption during setup operations (2015)Project scheduling under part…A decision support approach for assigning reviewers to proposals (2010)A decision support approach f…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Solving Airline Crew Scheduling Problems by Branch-and-Cut (1993)Scheduling resource-constrained projects with a flexible project structure (2015)A survey on the Software Project Scheduling Problem (2018)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A survey on the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Scheduling the professional soccer leagues of Austria and Germany (2004)Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (2006)Extensions of the resource-constrained project scheduling problem (2023)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An integrated survey of deterministic project scheduling (2001)Production and inventory management (1983)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (2011)Improving RCPSP solutions quality with Stacking Justification – Application with particle swarm optimization (2014)A branch-price-and-cut algorithm for multi-mode resource leveling (2015)Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Competitive Strategy: Techniques for Analyzing Industries and Competitors (1980)A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. (2001)Dynamic order acceptance and capacity planning on a single bottleneck resource (2007)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Project Scheduling—Theory and Practice (2005)Skilled workforce scheduling in Service Centres (2007)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Project management with time, cost, and quality considerations (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 2002Project Scheduling: A Research Handbook716 cited
  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 2003Project Scheduling with Time Windows and Scarce Resources305 cited
  • 1969Management Guide to PERT/CPM304 cited
  • 2000ProGen/πx – An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions95 cited
  • 1999Project Scheduling Under Partially Renewable Resource Constraints94 cited
  • 1998Resource-constrained multi-project management, a hierarchical decision support system52 cited
  • 2002Project Scheduling with Time Windows51 cited

Cited by

  • 2015Project scheduling under partially renewable resources and resource consumption during setup operations42 cited
  • 2010A decision support approach for assigning reviewers to proposals38 cited