SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
DEVELOPMENT OF AN INTEGRATED RISK ASSESSMENT FRAMEWORK FOR INTERNAL/EXTERNAL EVENTS AND ALL POWER MODES
2 references·4 citing·25 second hop
DEVELOPMENT OF AN INTEGRATED RISK ASSESSMENT FRAMEWORK FOR INTERNAL/EXTERNAL EVENTS AND ALL POWER MODES (2012)DEVELOPMENT OF AN INTEGRATED RISK ASSESSM…Seismic PSA method for multiple nuclear power plants in a site (2006)Seismic PSA method for multip…A fast BDD algorithm for large coherent fault trees analysis (2003)A fast BDD algorithm for larg…Development of network-based probabilistic safety assessment: A tool for risk analyst for nuclear facilities (2018)Development of network-based …Integrated risk assessment for multi-unit NPP sites—A comparison (2015)Integrated risk assessment fo…A systematic framework to investigate the coverage of abnormal operating procedures in nuclear power plants (2015)A systematic framework to inv…Investigating the TACOM measure as a general tool for quantifying the complexity of procedure guided tasks (2014)Investigating the TACOM measu…CURRENT ISSUES ON PRA REGARDING SEISMIC AND TSUNAMI EVENTS AT MULTI UNITS AND SITES BASED ON LESSONS LEARNED FROM TOHOKU EARTHQUAKE/TSUNAMI (2012)An event classification schema for evaluating site risk in a multi-unit nuclear power plant probabilistic risk assessment (2013)Probabilistic safety assessment of multi-unit nuclear power plant sites – An integrated approach (2014)Development of logical structure for multi-unit probabilistic safety assessment (2018)New algorithms for fault trees analysis (1993)A linear-time algorithm to find modules of fault trees (1996)A fault tree analysis strategy using binary decision diagrams (2002)Can we trust PRA? (2004)An improved decomposition scheme for assessing the reliability of embedded systems by using dynamic fault trees (2006)Multi-unit Level 1 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site (2018)The Cost of Thinking (1980)Development of NASA-TLX (Task Load Index): Results of Empirical and Theoretical Research (1988)Task Complexity: A Review and Analysis (1988)Empirical estimation of human error probabilities based on the complexity of proceduralized tasks in an analog environment (2021)Development of the DQFM method to consider the effect of correlation of component failures in seismic PSA of nuclear power plant (2003)An integrated modeling approach for event sequence development in multi-unit probabilistic risk assessment (2016)An improved multi-unit nuclear plant seismic probabilistic risk assessment approach (2017)Multi-unit risk assessment of nuclear power plants: Current status and issues (2018)An overview of PSA importance measures (2001)Human Factors Engineering Program Review Model (2004)Highlights from the literature on accident causation and system safety: Review of major ideas, recent contributions, and challenges (2010)A framework to estimate task opportunities from the operational experience of domestic nuclear power plants (2016)Improving the analysis of dependable systems by mapping fault trees into Bayesian networks (2001)Bayesian inference in probabilistic risk assessment—The current state of the art (2008)Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches (2011)
this work references cited by second hop

References

  • 2003A fast BDD algorithm for large coherent fault trees analysis115 cited
  • 2006Seismic PSA method for multiple nuclear power plants in a site50 cited

Cited by

  • 2015Integrated risk assessment for multi-unit NPP sites—A comparison19 cited
  • 2015A systematic framework to investigate the coverage of abnormal operating procedures in nuclear power plants19 cited
  • 2014Investigating the TACOM measure as a general tool for quantifying the complexity of procedure guided tasks17 cited
  • 2018Development of network-based probabilistic safety assessment: A tool for risk analyst for nuclear facilities14 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work