Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic
12 references·7 citing·42 second hop
Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic (2011)Comprehensive Hybrid Framework for Risk A…Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP (2010)Risk Management in the Constr…Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis (2010)Fuzzy Reliability Analyzer: Q…Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM (2008)Quantitative risk evaluation …Using fuzzy risk assessment to rate cost overrun risk in international construction projects (2007)Using fuzzy risk assessment t…Programmatic Cost Risk Analysis for Highway Megaprojects (2005)Programmatic Cost Risk Analys…Judgmental risk analysis process development in construction projects (2004)Judgmental risk analysis proc…Risk Analysis in Engineering and Economics (2003)Risk Analysis in Engineering …Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects (2002)Use of Fuzzy Logic for Predic…A decision support system for applying failure mode and effects analysis (2002)A decision support system for…Fuzzy sets (1996)Fuzzy setsEngineering Construction Risks - A Guide to Project Risk Analysis and Risk Management (1992)Engineering Construction Risk…Project risk assessment using the analytic hierarchy process (1991)Project risk assessment using…MODELLING OF TIME, COST AND RISK OF CONSTRUCTION WITH USING FUZZY LOGIC (2021)MODELLING OF TIME, COST AND R…Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects (2021)Managing Cost Risks: Toward a…Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India (2020)Risk analysis by integrated f…A hybrid risk prioritization approach in construction projects using failure mode and effective analysis (2020)A hybrid risk prioritization …Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties (2019)Quantitative assessment of ri…Consistency control and expert consistency prioritization for FFTA by using extent analysis method of trapezoidal FAHP (2017)Consistency control and exper…Investigation of Lab Fire Prevention Management System of Combining Root Cause Analysis and Analytic Hierarchy Process with Event Tree Analysis (2016)Investigation of Lab Fire Pre…Fuzzy sets (1965)A Guide to the project management body of knowledge (1996)A rough TOPSIS Approach for Failure Mode and Effects Analysis in Uncertain Environments (2013)A novel multiple-criteria decision-making-based FMEA model for risk assessment (2018)Risk Assessment Using a New Consulting Process in Fuzzy AHP (2019)Experts In Uncertainty (1991)Making Hard Decisions, an Introduction to Decision Analysis (1992)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Integrating system dynamics and fuzzy logic modelling for construction risk management (2008)Effects of contractual flexibility on conflict and project success in megaprojects (2017)Cost overruns of public sector construction projects: a developing country perspective (2019)Tender Evaluation by Fuzzy Sets (1985)Scope Management Using Project Definition Rating Index (1997)Modelling the dynamics of design error induced rework in construction (2000)Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front (2005)Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach (2008)Review of construction journals on causes of project cost overruns (2020)Modelling global risk factors affecting construction cost performance (2003)Risk assessment model selection in construction industry (2010)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Energy investment risk assessment for nations along China’s Belt & Road Initiative (2017)Introduction to Grey system theory (1989)Fuzzy TOPSIS approach for failure mode, effects and criticality analysis (2003)Failure mode and effects analysis using a group-based evidential reasoning approach (2008)Probability Concepts in Engineering Planning and Design (1975)Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2 (2004)Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects (2017)Multi-classifier information fusion in risk analysis (2020)Fuzzy Bayesian network based on an improved similarity aggregation method for risk assessment of storage tank accident (2021)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1956)The Analytic Hierarchy Process (1985)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1994)Evaluation of knowledge management tools using AHP (2005)Large engineering project risk management using a Bayesian belief network (2008)Analytic Hierarchy Process (AHP) in Group Decision Making and its Optimization With an Allocation of Information Granularity (2011)Dynamic safety assessment of natural gas stations using Bayesian network (2016)Extensions of the TOPSIS for group decision-making under fuzzy environment (2000)An approach for detecting, quantifying, and visualizing the evolution of a research field: A practical application to the Fuzzy Sets Theory field (2010)Science mapping software tools: Review, analysis, and cooperative study among tools (2011)Assessment and evaluation of contractor data against client goals using PERT approach (1997)Risk Management Model for International Construction Joint Ventures (1999)Risk response techniques employed currently for major projects (1999)
this work references cited by second hop

References

  • 1996Fuzzy sets46,880 cited
  • 2007Using fuzzy risk assessment to rate cost overrun risk in international construction projects374 cited
  • 2010Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP341 cited
  • 1991Project risk assessment using the analytic hierarchy process331 cited
  • 2003Risk Analysis in Engineering and Economics321 cited
  • 2002A decision support system for applying failure mode and effects analysis224 cited
  • 2005Programmatic Cost Risk Analysis for Highway Megaprojects194 cited
  • 2008Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM176 cited
  • 1992Engineering Construction Risks - A Guide to Project Risk Analysis and Risk Management141 cited
  • 2002Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects97 cited
  • 2010Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis77 cited
  • 2004Judgmental risk analysis process development in construction projects71 cited

Cited by

  • 2020A hybrid risk prioritization approach in construction projects using failure mode and effective analysis49 cited
  • 2017Consistency control and expert consistency prioritization for FFTA by using extent analysis method of trapezoidal FAHP

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

40 cited
  • 2021Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects38 cited
  • 2021MODELLING OF TIME, COST AND RISK OF CONSTRUCTION WITH USING FUZZY LOGIC37 cited
  • 2020Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India35 cited
  • 2019Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties20 cited
  • 2016Investigation of Lab Fire Prevention Management System of Combining Root Cause Analysis and Analytic Hierarchy Process with Event Tree Analysis14 cited