SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
16 references·0 citing·29 second hop
Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework (2010)Numerical method for determination of the…Production and Operations Analysis (2019)Production and Operations Ana…HOW MANY PARTS TO MAKE AT ONCE (2014)HOW MANY PARTS TO MAKE AT ONCEOptimal manufacturing batch size with rework process at a single-stage production system (2004)Optimal manufacturing batch s…Optimizing inventory decisions in a multi-stage multi-customer supply chain (2003)Optimizing inventory decision…Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time (2003)Integrated vendor–buyer coope…Integrated single vendor single buyer model with stochastic demand and variable lead time (2003)Integrated single vendor sing…Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging (2003)Determining the optimal lot s…Production lot sizing with the reworking of imperfect quality items produced (2001)Production lot sizing with th…Inventory management and production planning and scheduling (1999)Inventory management and prod…Optimal strategy for the integrated vendor-buyer inventory model (1998)Optimal strategy for the inte…A one-vendor multi-buyer integrated inventory model (1995)A one-vendor multi-buyer inte…How Many Parts to Make at Once (1990)How Many Parts to Make at OnceOptimality of Zero-Inventory Policies for Unreliable Manufacturing Systems (1988)Optimality of Zero-Inventory …Economic Production Cycles with Imperfect Production Processes (1986)Economic Production Cycles wi…Principles of inventory and materials management (1982)Principles of inventory and m…An integrated inventory model for a single supplier-single customer problem (1977)An integrated inventory model…A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)“A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* (1988)A one-vendor multi-buyer integrated inventory model: A comment (1995)The single-vendor single-buyer integrated production-inventory model with a generalised policy (1997)Buyer vendor coordination models in supply chain management (2005)Optimal control of production rate in a failure prone manufacturing system (1986)On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks (2006)Dynamic modeling and control of supply chain systems: A review (2007)OR/MS models for supply chain disruptions: a review (2015)Production and inventory management (1983)Communication and Uncertainty in Concurrent Engineering (1998)Economic production quantity model for items with imperfect quality (2000)Using multi-objective genetic algorithm for partner selection in green supply chain problems (2010)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Supply Chain Coordination with Contracts (2003)Optimal Ordering Strategies for Announced Price Increases (1985)An Analytical Determination of Lead Time with Normal Demand (1991)A dynamic product quality evaluation based pricing model for perishable food supply chains (2012)A Supplier's Optimal Quantity Discount Policy Under Asymmetric Information (2000)Economic production quantity with rework process at a single-stage manufacturing system with planned backorders (2009)A production-inventory model of imperfect quality products in a three-layer supply chain (2010)Supply Chain Collaboration: (2005)Sensitivity analysis: A review of recent advances (2015)Channel Dynamics Under Price and Service Competition (2000)Inventory Management with Asset-Based Financing (2004)Facility location under uncertainty: a review (2006)Review of inventory systems with deterioration since 2001 (2012)Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission (2018)
this work references cited by second hop

References

  • 1999Inventory management and production planning and scheduling2,787 cited
  • 1990How Many Parts to Make at Once1,121 cited
  • 1986Economic Production Cycles with Imperfect Production Processes1,049 cited
  • 2019Production and Operations Analysis947 cited
  • 1977An integrated inventory model for a single supplier-single customer problem918 cited
  • 1982Principles of inventory and materials management697 cited
  • 1995A one-vendor multi-buyer integrated inventory model535 cited
  • 1988Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems412 cited
  • 2014HOW MANY PARTS TO MAKE AT ONCE380 cited
  • 2001Production lot sizing with the reworking of imperfect quality items produced287 cited
  • 2004Optimal manufacturing batch size with rework process at a single-stage production system249 cited
  • 2003Integrated single vendor single buyer model with stochastic demand and variable lead time248 cited
  • 2003Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging222 cited
  • 2003Optimizing inventory decisions in a multi-stage multi-customer supply chain214 cited
  • 2003Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

194 cited
  • 1998Optimal strategy for the integrated vendor-buyer inventory model192 cited
  • Cited by

    No citing works inside the corpus for this window.