SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A compound methodology to assess the impact of human and organizational factors impact on the risk level of hazardous industrial plants
13 references·9 citing·39 second hop
A compound methodology to assess the impact of human and organizational factors impact on the risk level of hazardous industrial plants (2013)A compound methodology to assess the impa…Quantitative risk analysis offshore—Human and organizational factors (2011)Quantitative risk analysis of…Inclusion of fatigue effects in human reliability analysis (2011)Inclusion of fatigue effects …A fuzzy modeling application of CREAM methodology for human reliability analysis (2005)A fuzzy modeling application …Model-based human reliability analysis: prospects and requirements (2003)Model-based human reliability…Structured information analysis for human reliability analysis of emergency tasks in nuclear power plants (2001)Structured information analys…Human factors impact on risk analysis of complex systems (2000)Human factors impact on risk …Cognitive Reliability and Error Analysis Method (CREAM) (1998)Cognitive Reliability and Err…A framework for the analysis of cognitive reliability in complex systems: a recovery centred approach (1997)A framework for the analysis …Fuzzy sets (1996)Fuzzy setsIncorporating organizational factors into risk assessment through the analysis of work processes (1994)Incorporating organizational …Peer-review study of the draft handbook for human-reliability analysis with emphasis on nuclear-power-plant applications, NUREG/CR-1278 (1983)Peer-review study of the draf…Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report (1983)Handbook of human-reliability…Fuzzy sets (1965)Fuzzy setsVulnerability Assessment for Major Industrial Risks Proposal for a Semiquantitative Analysis Method (VAMIR) Application: Oil and Gas Industry (2020)Vulnerability Assessment for …Are too many safety measures crowding each other out? (2018)Are too many safety measures …Simulator based performance metrics to estimate reliability of control room operators (2017)Simulator based performance m…Risk registers: Structuring data collection to develop risk intelligence (2017)Risk registers: Structuring d…Incorporating individual differences in human reliability analysis: An extension to the virtual experimental technique (2017)Incorporating individual diff…A quantitative measure of fitness for duty and work processes for human reliability analysis (2017)A quantitative measure of fit…A safety-critical decision support system evaluation using situation awareness and workload measures (2016)A safety-critical decision su…Human Error Probability Estimation in Atex-hmi Area Classification: from Therp to Fuzzy Cream (2015)Human Error Probability Estim…A new approach to the QS university ranking using the composite I ‐distance indicator: Uncertainty and sensitivity analyses (2015)A new approach to the QS univ…Safety barriers: Definition, classification, and performance (2006)International Organization for Standardization (2011)Introducing the STAMP method in road tunnel safety assessment (2012)An enhanced risk assessment framework for business continuity management systems (2016)Managing the Risks of Organizational Accidents (2016)Learning from accidents: Interactions between human factors, technology and organisations as a central element to validate risk studies (2017)Designing Complex Organizations (1973)The analytic hierarchy process : planning, priority setting, resource allocation (1980)Normal Accidents: Living with High Risk Technologies (1985)The work process analysis model (WPAM) (1994)Risk indicators as a tool for risk control (2001)Learning from experience in high-hazard organizations (2002)Categorization of action slips. (1981)The impact of sleep deprivation on decision making: A review. (2000)An Overview of Human Reliability Analysis Techniques in Manufacturing Operations (2013)BN-SLIM: A Bayesian Network methodology for human reliability assessment based on Success Likelihood Index Method (SLIM) (2019)A bibliometric analysis of human reliability research (2020)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1956)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1994)Incorporating organizational factors into probabilistic risk assessment of complex socio-technical systems: Principles and theoretical foundations (2009)A data-informed PIF hierarchy for model-based Human Reliability Analysis (2012)Engineering Psychology and Human Performance (2015)The Concept of Probability in Safety Assessments of Technological Systems (1990)The paradoxes of almost totally safe transportation systems (2001)How Useful Is Quantitative Risk Assessment? (2004)Cockpit Checklists: Concepts, Design, and Use (1993)Development and application of a human error identification tool for air traffic control (2002)Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents (2006)A group evidential reasoning approach based on expert reliability (2015)An Evidential Reasoning‐Based CREAM to Human Reliability Analysis in Maritime Accident Process (2017)Review of techniques and challenges of human and organizational factors analysis in maritime transportation (2021)Extensions of the TOPSIS for group decision-making under fuzzy environment (2000)An approach for detecting, quantifying, and visualizing the evolution of a research field: A practical application to the Fuzzy Sets Theory field (2010)Science mapping software tools: Review, analysis, and cooperative study among tools (2011)Family resemblances: Studies in the internal structure of categories (1975)Basic objects in natural categories (1976)Soft set theory—First results (1999)Driver distraction and driver inattention: Definition, relationship and taxonomy (2011)A Human Error Approach to Aviation Accident Analysis (2017)
this work references cited by second hop

References

  • 1965Fuzzy sets67,827 cited
  • 1996Fuzzy sets46,880 cited
  • 1983Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report1,460 cited
  • 1998Cognitive Reliability and Error Analysis Method (CREAM)1,101 cited
  • 1983Peer-review study of the draft handbook for human-reliability analysis with emphasis on nuclear-power-plant applications, NUREG/CR-1278281 cited
  • 2005A fuzzy modeling application of CREAM methodology for human reliability analysis230 cited
  • 2003Model-based human reliability analysis: prospects and requirements159 cited
  • 2011Quantitative risk analysis offshore—Human and organizational factors140 cited
  • 1994Incorporating organizational factors into risk assessment through the analysis of work processes113 cited
  • 2011Inclusion of fatigue effects in human reliability analysis106 cited
  • 2000Human factors impact on risk analysis of complex systems63 cited
  • 1997A framework for the analysis of cognitive reliability in complex systems: a recovery centred approach48 cited
  • 2001Structured information analysis for human reliability analysis of emergency tasks in nuclear power plants43 cited

Cited by

  • 2015A new approach to the QS university ranking using the composite I ‐distance indicator: Uncertainty and sensitivity analyses

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

94 cited
  • 2016A safety-critical decision support system evaluation using situation awareness and workload measures67 cited
  • 2017Incorporating individual differences in human reliability analysis: An extension to the virtual experimental technique30 cited
  • 2017Risk registers: Structuring data collection to develop risk intelligence25 cited
  • 2017A quantitative measure of fitness for duty and work processes for human reliability analysis23 cited
  • 2017Simulator based performance metrics to estimate reliability of control room operators23 cited
  • 2018Are too many safety measures crowding each other out?16 cited
  • 2020Vulnerability Assessment for Major Industrial Risks Proposal for a Semiquantitative Analysis Method (VAMIR) Application: Oil and Gas Industry13 cited
  • 2015Human Error Probability Estimation in Atex-hmi Area Classification: from Therp to Fuzzy Cream11 cited