SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Heuristics for multimode scheduling problems with dedicated resources
13 references·0 citing·29 second hop
Heuristics for multimode scheduling problems with dedicated resources (1998)Heuristics for multimode scheduling probl…Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes (1995)Project Scheduling under Reso…Project Scheduling under Resource Constraints (1995)Project Scheduling under Reso…Minimizing Resource Availability Costs in Time-Limited Project Networks (1995)Minimizing Resource Availabil…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…Resource-Constrained Project Scheduling (1994)Resource-Constrained Project …Hierarchical models for multi-project planning and scheduling (1993)Hierarchical models for multi…Heuristics for scheduling projects with resource restrictions and several resource-duration modes (1993)Heuristics for scheduling pro…Scheduling of Project Networks by Job Assignment (1991)Scheduling of Project Network…Advances in Project Scheduling (1989)Advances in Project SchedulingScheduling under resource constraints - deterministic models (1986)Scheduling under resource con…Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Minimizing Costs of Resource …Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS (1980)ON CERTAIN MODELS OF RESOURCE…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity networks: Project planning and control by network models (1977)Differential evolution for solving multi-mode resource-constrained project scheduling problems (2008)Construction and evaluation framework for a real-life project database (2014)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes (1996)Local search for nonpreemptive multi-mode resource-constrained project scheduling (1997)Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)Project management with CPM and PERT (1965)Intransitive Indifference in Preference Theory: A Survey (1970)Stochastic scheduling problems I — General strategies (1984)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Resource-constrained project scheduling problem: review of past and recent developments (2018)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (2007)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING (1993)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Decision support for disaster management (2010)A genetic algorithm for resource-constrained scheduling (1996)Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (2000)Project network models with discounted cash flows a guided tour through recent developments (1997)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)
this work references cited by second hop

References

  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1984Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time204 cited
  • 1989Advances in Project Scheduling196 cited
  • 1986Scheduling under resource constraints - deterministic models180 cited
  • 1995Project Scheduling under Resource Constraints168 cited
  • 1991Scheduling of Project Networks by Job Assignment162 cited
  • 1995Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes157 cited
  • 1993Heuristics for scheduling projects with resource restrictions and several resource-duration modes156 cited
  • 1993Hierarchical models for multi-project planning and scheduling143 cited
  • 1995Minimizing Resource Availability Costs in Time-Limited Project Networks136 cited
  • 1994Resource-Constrained Project Scheduling63 cited
  • 1980ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS41 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work