The article explores the problem of an economically based type I continuous sampling plan (CSP-1 plan) under linear inspection cost. By assuming that the per unit inspection cost is linearly proportional to the average number of inspections per inspection cycle, and by solving the modified Cassady et al.'s model, we not only have the required level of product quality but also obtain the minimum total expected cost per unit produced.