SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Constraint multiproduct joint-replenishment inventory control problem using uncertain programming
16 references·16 citing·34 second hopsampled
Constraint multiproduct joint-replenishment inventory control problem using uncertain programming (2011)Constraint multiproduct joint-replenishme…Optimal manufacturing batch size with rework process at a single-stage production system (2004)Optimal manufacturing batch s…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging (2003)Determining the optimal lot s…The economic production quantity (EPQ) with shortage derived algebraically (2001)The economic production quant…Production lot sizing with the reworking of imperfect quality items produced (2001)Production lot sizing with th…The EOQ with backlogging derived without derivatives (1999)The EOQ with backlogging deri…An EOQ model for items with Weibull distribution deterioration, shortages and trended demand: An extension of Philip's model (1998)An EOQ model for items with W…Optimal EOQ Models for Deteriorating Items with Time-Varying Demand (1996)Optimal EOQ Models for Deteri…EOQ model for items with Weibull distribution deterioration, shortages and trended demand (1996)EOQ model for items with Weib…On an inventory model with deteriorating items and decreasing time-varying demand and shortages (1995)On an inventory model with de…An EOQ Model for Deteriorating Items with Shortages and Time-Varying Demand (1995)An EOQ Model for Deterioratin…A Heuristic for Replenishment of Deteriorating Items with a Linear Trend in Demand (1993)A Heuristic for Replenishment…An EOQ Model for Deteriorating Items with Shortages and a Linear Trend in Demand (1991)An EOQ Model for Deterioratin…A Note on the Heuristic for Replenishment of Trended Inventories Considering Shortages (1987)A Note on the Heuristic for R…Inventory Replenishment Policy for a Linear Trend in Demand—An Analytical Solution (1977)Inventory Replenishment Polic…Dynamic Version of the Economic Lot Size Model (1958)Dynamic Version of the Econom…A constrained multi-item EOQ inventory model for reusable items: Reinforcement learning-based differential evolution and particle swarm optimization (2022)A constrained multi-item EOQ …An EOQ model with backordering for perishable items under multiple advanced and delayed payments policies (2021)An EOQ model with backorderin…A multi-constrained supply chain model with optimal production rate in relation to quality of products under stochastic fuzzy demand (2020)A multi-constrained supply ch…Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction (2019)Coordinating Supply-Chain Man…Joint replenishment decision considering shortages, partial demand substitution, and defective items (2018)Joint replenishment decision …Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand (2018)Imperfect Multi-Stage Lean Ma…A lot sizing model with advance payment and planned backordering (2018)A lot sizing model with advan…Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering (2017)Ordering policies for non-ins…Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand (2017)Optimal replenishment time fo…An EOQ model for decaying item with full advanced payment and conditional discount (2017)An EOQ model for decaying ite…A systematic literature review on the joint replenishment problem solutions: 2006-2015 (2017)A systematic literature revie…An economic order quantity model with partial backordering and incremental discount (2015)An economic order quantity mo…Multi-item partial backlogging inventory models over random planninghorizon in random fuzzy environment (2014)Multi-item partial backloggin…An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets (2014)An integrated production inve…Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment (2012)Revisiting a fuzzy rough econ…A constrained multi-product pricing and inventory control problem (2012)A constrained multi-product p…An EOQ Model for Items with Weibull Distribution Deterioration (1973)(T, Si) Policy Inventory Model for Deteriorating Items with Time Proportional Demand (1981)An EOQ model with delay in payments and time varying deterioration rate (2011)A production-inventory model with probabilistic deterioration in two-echelon supply chain management (2012)Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing (2014)A model for an exponentially decaying inventory (1963)Survey of Literature on Continuously Deteriorating Inventory Models (1991)An EOQ model with ramp type demand rate, time dependent deterioration rate, unit production cost and shortages (2004)A Review on Deteriorating Inventory Study (2010)A century of evolution from Harris׳s basic lot size model: Survey and research agenda (2014)Analysis of Inventory Systems. (1964)Operations Research in Production Planning, Scheduling and Inventory Control. (1975)How Many Parts to Make at Once (1990)A genetic algorithm for vendor managed inventory control system of multi-product multi-constraint economic order quantity model (2010)An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand (2012)Economic Production Cycles with Imperfect Production Processes (1986)An economic production quantity model with random defective rate, rework process and backorders for a single stage production system (2014)Coordination mechanism of dual-channel closed-loop supply chains considering product quality and return (2019)An economic production lot size model in an imperfect production system (2009)Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return (2009)An economic order quantity (EOQ) for items with imperfect quality and inspection errors (2010)An inventory model under two levels of trade credit and limited storage space derived without derivatives (2005)Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note (2006)Exact closed-form solutions for “optimal inventory model for items with imperfect quality and shortage backordering” (2009)Economic production quantity with rework process at a single-stage manufacturing system with planned backorders (2009)A production-inventory model of imperfect quality products in a three-layer supply chain (2010)Perishable Inventory Theory: A Review (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Quantitative models for reverse logistics: A review (1997)A Deterministic Inventory System with an Inventory-Level-Dependent Demand Rate (1988)A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time (1991)An EOQ model for deteriorating items with time varying demand and partial backlogging (1999)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Smart “Predict, then Optimize” (2021)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 1958Dynamic Version of the Economic Lot Size Model2,068 cited
  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 1977Inventory Replenishment Policy for a Linear Trend in Demand—An Analytical Solution418 cited
  • 2001Production lot sizing with the reworking of imperfect quality items produced287 cited
  • 1996Optimal EOQ Models for Deteriorating Items with Time-Varying Demand257 cited
  • 2004Optimal manufacturing batch size with rework process at a single-stage production system249 cited
  • 2003Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging222 cited
  • 2001The economic production quantity (EPQ) with shortage derived algebraically215 cited
  • 1998An EOQ model for items with Weibull distribution deterioration, shortages and trended demand: An extension of Philip's model198 cited
  • 1999The EOQ with backlogging derived without derivatives197 cited
  • 1991An EOQ Model for Deteriorating Items with Shortages and a Linear Trend in Demand191 cited
  • 1995An EOQ Model for Deteriorating Items with Shortages and Time-Varying Demand140 cited
  • 1987A Note on the Heuristic for Replenishment of Trended Inventories Considering Shortages128 cited
  • 1993A Heuristic for Replenishment of Deteriorating Items with a Linear Trend in Demand

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

117 cited
  • 1995On an inventory model with deteriorating items and decreasing time-varying demand and shortages94 cited
  • 1996EOQ model for items with Weibull distribution deterioration, shortages and trended demand88 cited
  • Cited by

    • 2017Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering77 cited
    • 2012Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment74 cited
    • 2017An EOQ model for decaying item with full advanced payment and conditional discount70 cited
    • 2022A constrained multi-item EOQ inventory model for reusable items: Reinforcement learning-based differential evolution and particle swarm optimization55 cited
    • 2014An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets50 cited
    • 2015An economic order quantity model with partial backordering and incremental discount47 cited
    • 2014Multi-item partial backlogging inventory models over random planninghorizon in random fuzzy environment42 cited
    • 2018A lot sizing model with advance payment and planned backordering42 cited
    • 2018Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand41 cited
    • 2020A multi-constrained supply chain model with optimal production rate in relation to quality of products under stochastic fuzzy demand39 cited
    • 2018Joint replenishment decision considering shortages, partial demand substitution, and defective items33 cited
    • 2017A systematic literature review on the joint replenishment problem solutions: 2006-201532 cited
    • 2017Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand31 cited
    • 2019Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction29 cited
    • 2021An EOQ model with backordering for perishable items under multiple advanced and delayed payments policies29 cited
    • 2012A constrained multi-product pricing and inventory control problem29 cited