Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
12 references·4 citing·18 second hop
Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling (2004)Critical path determination by incorporat…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Linear Scheduling Model: Development of Controlling Activity Path (1998)Linear Scheduling Model: Deve…New Generation of Planning Structures (1993)New Generation of Planning St…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Formal Development of Line‐of‐Balance Technique (1990)Formal Development of Line‐of…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Application of Linear Scheduling (1986)Application of Linear Schedul…Time Space Scheduling Method (1982)Time Space Scheduling MethodLinear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Simulation of Repetitive-Unit Construction (1980)Simulation of Repetitive-Unit…Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …Construction Planning for Linear Projects (1980)Construction Planning for Lin…A comparative study of machine learning regression models for predicting construction duration (2023)A comparative study of machin…A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Two-Stage Scheduling Model for Resource Leveling of Linear Projects (2014)Two-Stage Scheduling Model fo…Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Challenges and opportunities …Professional Construction Management (1976)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Effect of learning on line-of-balance scheduling (2001)Modern Construction Management (2012)Resource-driven scheduling of repetitive activities (1998)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Criticism of CPM for Project Planning Analysis (1984)Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions (2009)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)Work Continuity Constraints in Project Scheduling (2005)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)
this work references cited by second hop

References

  • 1998Scheduling Projects with Repeating Activities309 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1998Linear Scheduling Model: Development of Controlling Activity Path168 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 1986Application of Linear Scheduling128 cited
  • 1980Construction Planning—Beyond the Critical Path123 cited
  • 1993New Generation of Planning Structures113 cited
  • 1982Time Space Scheduling Method96 cited
  • 1990Formal Development of Line‐of‐Balance Technique90 cited
  • 1980Simulation of Repetitive-Unit Construction73 cited

Cited by

  • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
  • 2013Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling48 cited
  • 2014Two-Stage Scheduling Model for Resource Leveling of Linear Projects44 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2023
A comparative study of machine learning regression models for predicting construction duration
40 cited