SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Determining a reasonable concession period for private sector provision of public works and service
9 references·11 citing·40 second hop
Determining a reasonable concession period for private sector provision of public works and service (2006)Determining a reasonable concession perio…A fuzzy simulation model for evaluating the concession items of public–private partnership schemes (2007)A fuzzy simulation model for …Risk Concession Model for Build/Operate/Transfer Contract Projects (2005)Risk Concession Model for Bui…Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects (2005)Financial Viability Analysis …Life-Cycle Costing: Using Activity-Based Costing and Monte Carlo Methods to Manage Future Costs and Risks (2003)Life-Cycle Costing: Using Act…Decision Modeling with Microsoft Excel (2001)Decision Modeling with Micros…Government support and risk-return trade-off in China's BOT power projects (2000)Government support and risk-r…Project Financing: Asset-Based Financial Engineering (1996)Project Financing: Asset-Base…Project Management: Techniques in Planning and Controlling Construction Projects (1984)Project Management: Technique…Discrete-Event System Simulation (1984)Discrete-Event System Simulat…Profit Allocation and Subsidy Mechanism for Public–Private Partnership Toll Road Projects (2020)Profit Allocation and Subsidy…Optimizing the concession period of PPP projects for fair allocation of financial risk (2019)Optimizing the concession per…Determining the Value of Standby Letter of Credit in Transfer Stage of a PPP Project to Control Concessionaire’s Opportunistic Behavior (2019)Determining the Value of Stan…System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors (2018)System Dynamics Model to Dete…BALANCING PUBLIC AND PRIVATE INTERESTS THROUGH OPTIMIZATION OF CONCESSION AGREEMENT DESIGN FOR USER-PAY PPP PROJECTS (2018)BALANCING PUBLIC AND PRIVATE …Optimizing an Equity Capital Structure Model for Public–Private Partnership Projects Involved with Public Funds (2017)Optimizing an Equity Capital …A review of public-private partnership: critical factors of concession period (2016)A review of public-private pa…Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects (2015)Modeling the Concession Perio…An alternative incomplete information bargaining model for identifying the reasonable concession period of a BOT project (2014)An alternative incomplete inf…A Decision Support System for the determination of concession period length in transportation project under BOT contract (2012)A Decision Support System for…Structuring PPP toll-road contracts to achieve public pricing objectives (2011)Structuring PPP toll-road con…Concessions for Infrastructure. A Guide to their Design and Award (1998)Case study of government initiatives for PRC's BOT power plant project (2000)Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure (2008)Real option application in PPP/PFI project negotiation (2009)A model for determining the optimal project life span and concession period of BOT projects (2016)Risk assessment for public–private partnership projects: using a fuzzy analytic hierarchical process method and expert opinion in China (2016)Fuzzy sets (1965)Fuzzy sets (1996)Public Private Partnerships: Managing Risks and Opportunities (2003)Cluster Analysis of the Intellectual Structure of PPP Research (2018)Assessing and Prioritizing Risks in Public-Private Partnership (PPP) Projects Using the Integration of Fuzzy Multi-Criteria Decision-Making Methods (2021)Highway pricing and capacity choice in a road network under a build–operate–transfer scheme (2000)A note on “highway pricing and capacity choice in a road network under a build-operate-transfer scheme” (2002)Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region (2009)System Dynamics (SD) -based concession pricing model for PPP highway projects (2011)Improving Sustainability Performance for Public-Private-Partnership (PPP) Projects (2016)Management Guide to PERT/CPM (1969)Simulation with Arena (1998)Win–Win Concession Period Determination Methodology (2009)Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects (2012)Conceptual Framework for the Performance Measurement of Public-Private Partnerships (2014)Towards a Methodology for Developing Evidence‐Informed Management Knowledge by Means of Systematic Review (2003)Critical success factors for PPP/PFI projects in the UK construction industry (2005)Review of studies on the Critical Success Factors for Public–Private Partnership (PPP) projects from 1990 to 2013 (2015)Competitiveness in the construction industry: A contractor’s perspective on barriers to improving the construction industry performance (2020)Systematic analysis of PPP research in construction journals: from 2009 to 2019 (2020)Resource-Activity Critical-Path Method for Construction Planning (2003)Fuzzy Monte Carlo Simulation and Risk Assessment in Construction (2009)Valuation techniques for infrastructure investment decisions (2004)Why Study Large Projects? An Introduction to Research on Project Finance (2004)Factors influencing the success of PPP at feasibility stage – A tripartite comparison study in Hong Kong (2012)Parallel and distributed simulation systems (2002)Verification and validation of simulation models (2012)Discrete Event System Simulation (2024)Rola rachunkowości zarządczej we wspomaganiu zarządzania dokonaniami przedsiębiorstwa (2009)Understanding service uncertainties in industrial product–service system cost estimation (2010)A through-life costing methodology for use in product–service-systems (2014)A Translation Approach To Teaching Linear Program Formulation (2004)Capital structure optimization for build–operate–transfer (BOT) projects using a stochastic and multi-objective approach (2009)Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants (2009)
this work references cited by second hop

References

  • 1984Discrete-Event System Simulation3,639 cited
  • 1996Project Financing: Asset-Based Financial Engineering330 cited
  • 1984Project Management: Techniques in Planning and Controlling Construction Projects232 cited
  • 2003Life-Cycle Costing: Using Activity-Based Costing and Monte Carlo Methods to Manage Future Costs and Risks175 cited
  • 2005Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects172 cited
  • 2005Risk Concession Model for Build/Operate/Transfer Contract Projects140 cited
  • 2001Decision Modeling with Microsoft Excel79 cited
  • 2000Government support and risk-return trade-off in China's BOT power projects74 cited
  • 2007A fuzzy simulation model for evaluating the concession items of public–private partnership schemes67 cited

Cited by

  • 2016A review of public-private partnership: critical factors of concession period53 cited
  • 2019Optimizing the concession period of PPP projects for fair allocation of financial risk51 cited
  • 2017Optimizing an Equity Capital Structure Model for Public–Private Partnership Projects Involved with Public Funds50 cited
  • 2015Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects49 cited
  • 2012A Decision Support System for the determination of concession period length in transportation project under BOT contract

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

48 cited
  • 2014An alternative incomplete information bargaining model for identifying the reasonable concession period of a BOT project43 cited
  • 2020Profit Allocation and Subsidy Mechanism for Public–Private Partnership Toll Road Projects40 cited
  • 2018System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors36 cited
  • 2018BALANCING PUBLIC AND PRIVATE INTERESTS THROUGH OPTIMIZATION OF CONCESSION AGREEMENT DESIGN FOR USER-PAY PPP PROJECTS35 cited
  • 2019Determining the Value of Standby Letter of Credit in Transfer Stage of a PPP Project to Control Concessionaire’s Opportunistic Behavior35 cited
  • 2011Structuring PPP toll-road contracts to achieve public pricing objectives35 cited