Overlapping design and construction activities and an optimization approach to minimize rework
16 references·4 citing·52 second hop
Overlapping design and construction activities and an optimization approach to minimize rework (2013)Overlapping design and construction activ…A methodology for scheduling overlapped design activities based on dependency information (2012)A methodology for scheduling …A system dynamics model for assessing the impacts of design errors in construction projects (2011)A system dynamics model for a…Measuring the Impact of Rework on Construction Cost Performance (2009)Measuring the Impact of Rewor…Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance (2008)Early Contractor Involvement …Contributions of designers to improving buildability and constructability (2005)Contributions of designers to…Concurrent Engineering Approach to Reducing Design Delivery Time (2005)Concurrent Engineering Approa…Simulation of the New Product Development Process for Performance Improvement (2004)Simulation of the New Product…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Genetic Optimization for Dynamic Project Control (2003)Genetic Optimization for Dyna…Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects (2001)Dynamic Planning and Control …Improving the Design-Construction Interface (1998)Improving the Design-Construc…The historical roots of concurrent engineering fundamentals (1997)The historical roots of concu…A Model-Based Framework to Overlap Product Development Activities (1997)A Model-Based Framework to Ov…STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)STROBOSCOPE: State and Resour…Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…Quantitative Effects of Construction Changes on Labor Productivity (1995)Quantitative Effects of Const…Risk assessment of fast-track projects: a systems-based approach (2019)Risk assessment of fast-track…Modelling the boundaries of project fast-tracking (2017)Modelling the boundaries of p…Classics in megaproject management: A structured analysis of three major works (2017)Classics in megaproject manag…Optimization of overlapping activities in the design phase of construction projects (2015)Optimization of overlapping a…The new new product development game (1986)Product development performance: strategy, organization, and management in the world auto industry (1991)A model-based method for organizing tasks in product development (1994)Identifying Controlling Features of Engineering Design Iteration (1997)Developing Products on “Internet Time”: The Anatomy of a Flexible Development Process (2001)The scope and governance of international R&D alliances (2004)Introduction to System Dynamics Modeling with DYNAMO (1997)Introduction to System Dynamics Modeling with DYNAMO (1997)Megaprojects and Risk (2003)Rework Causation: Emergent Theoretical Insights and Implications for Research (2016)Investigating design changes in Malaysian building projects (2017)Study the delays and conflicts for construction projects and their mutual relationship: A review (2022)Project Management With Cpm, Pert and Precedence Diagramming (1983)System Dynamics Modeling for Project Management (1992)Dynamic change management for construction: introducing the change cycle into model‐based project management (2003)Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects (2005)Integrating system dynamics and fuzzy logic modelling for construction risk management (2008)Causes of Quality Deviations in Design and Construction (1992)Quantifying the causes and costs of rework in construction (2000)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling (2011)Analyzing Causes for Reworks in Construction Projects in China (2014)Competing in digital ecosystems (2018)Modeling Construction Labor Productivity (1990)Labor Productivity Drivers and Opportunities in the Construction Industry (2003)Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore (2016)Factors influencing labor productivity on construction sites (2016)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Fuzzy sets (1965)Fuzzy sets (1996)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)A review of methods and algorithms for optimizing construction scheduling (2013)Simulation Modeling and Analysis. (1983)Simulation modeling and analysis (1999)Delivering Sustainable, High-Performance Buildings: Influence of Project Delivery Methods on Integration and Project Outcomes (2011)Investigating key challenges in major public engineering projects by a network-theory based analysis of stakeholder concerns: A case study (2016)Factor dynamics to facilitate circular economy adoption in construction (2021)General and Industrial Management (1986)The House of Quality (1988)A decision analytic framework for evaluating concurrent engineering (1999)Having a strategy for new service development – does it really matter? (2013)PRODUCT DESIGN AND DEVELOPMENT (2018)Schedule Optimization Using Genetic Algorithms (1991)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Discrete-Event System Simulation (1984)General-Purpose Systems for Effective Construction Simulation (1999)Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management (2009)Theory of Modeling and Simulation (2018)
this work references cited by second hop

References

  • 1997A Model-Based Framework to Overlap Product Development Activities605 cited
  • 2009Measuring the Impact of Rework on Construction Cost Performance352 cited
  • 1996STROBOSCOPE: State and Resource Based Simulation of Construction Processes343 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 2008Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance214 cited
  • 1995Quantitative Effects of Construction Changes on Labor Productivity191 cited
  • 2011A system dynamics model for assessing the impacts of design errors in construction projects165 cited
  • 2001Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects157 cited
  • 1997The historical roots of concurrent engineering fundamentals117 cited
  • 2004Simulation of the New Product Development Process for Performance Improvement107 cited
  • 2005Concurrent Engineering Approach to Reducing Design Delivery Time91 cited
  • 1998Improving the Design-Construction Interface86 cited
  • 2012A methodology for scheduling overlapped design activities based on dependency information72 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2005
Contributions of designers to improving buildability and constructability
70 cited
  • 2003Genetic Optimization for Dynamic Project Control70 cited
  • Cited by

    • 2017Classics in megaproject management: A structured analysis of three major works52 cited
    • 2017Modelling the boundaries of project fast-tracking42 cited
    • 2015Optimization of overlapping activities in the design phase of construction projects42 cited
    • 2019Risk assessment of fast-track projects: a systems-based approach40 cited