SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Improved Evolutionary Algorithm Design for the Project Scheduling Problem Based on Runtime Analysis
8 references·2 citing·40 second hop
Improved Evolutionary Algorithm Design for the Project Scheduling Problem Based on Runtime Analysis (2013)Improved Evolutionary Algorithm Design fo…Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler (2012)Ant Colony Optimization for S…Using multi-objective metaheuristics to solve the software project scheduling problem (2011)Using multi-objective metaheu…Time-line based model for software project scheduling with genetic algorithms (2008)Time-line based model for sof…Software project management with GAs (2007)Software project management w…Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Experimental investigation of…From the Vendor’s Perspective: Exploring the Value Proposition in Information Technology Outsourcing1, 2 (2003)From the Vendor’s Perspective…Genetic Algorithms for Project Management (2001)Genetic Algorithms for Projec…Applications of Global Information Technology: Key Issues for Management (1991)Applications of Global Inform…Cooperative coevolution with an improved resource allocation for large-scale multi-objective software project scheduling (2019)Cooperative coevolution with …A survey on the Software Project Scheduling Problem (2018)A survey on the Software Proj…An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)A survey on the resource-constrained project scheduling problem (1995)A genetic algorithm for resource-constrained scheduling (1996)Solving software project scheduling problems with ant colony optimization (2012)A Q-learning-based memetic algorithm for multi-objective dynamic software project scheduling (2017)The Discovery of Grounded Theory: Strategies for Qualitative Research. (1968)Case Study Research: Design and Methods (1984)Firm Resources and Sustained Competitive Advantage (1991)Performance Effects of Information Technology Synergies in Multibusiness Firms1 (2006)A review of the IT outsourcing literature: Insights for practice (2009)Service Systems (2014)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Ant colony optimization for resource-constrained project scheduling (2002)A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution (2017)A state of the art review of intelligent scheduling (2018)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects (2004)THE GLOBALIZATION OF MARKETS (1983)Competition in Global Industries (1988)Values, personal information privacy, and regulatory approaches (1995)Information Privacy: Corporate Management and National Regulation (2000)Deploying Common Systems Globally: The Dynamics of Control (2004)Managing Across Borders: The Transnational Solution (2009)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Scheduling and staffing multiple projects with a multi-skilled workforce (2009)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)Project management : a systems approach to planning, scheduling, and controlling (1995)A hybrid genetic algorithm for the resource-constrained project scheduling problem (2007)Dynamic Software Project Scheduling through a Proactive-Rescheduling Method (2015)A competitive genetic algorithm for resource-constrained project scheduling (1998)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A bi-objective robust resource allocation model for the RCPSP considering resource transfer costs (2019)Bayesian Optimization in a Billion Dimensions via Random Embeddings (2016)Multiple Criteria Decision Analysis (2016)
this work references cited by second hop

References

  • 2005Experimental investigation of heuristics for resource-constrained project scheduling: An update754 cited
  • 2003From the Vendor’s Perspective: Exploring the Value Proposition in Information Technology Outsourcing1, 2699 cited
  • 1991Applications of Global Information Technology: Key Issues for Management319 cited
  • 2007Software project management with GAs268 cited
  • 2012Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler180 cited
  • 2001Genetic Algorithms for Project Management116 cited
  • 2008Time-line based model for software project scheduling with genetic algorithms105 cited
  • 2011Using multi-objective metaheuristics to solve the software project scheduling problem60 cited

Cited by

  • 2018A survey on the Software Project Scheduling Problem46 cited
  • 2019Cooperative coevolution with an improved resource allocation for large-scale multi-objective software project scheduling41 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work