The Effect of Client and Type and Size of Construction Work on a Contractor's Bidding Strategy
8 references·7 citing·33 second hop
The Effect of Client and Type and Size of Construction Work on a Contractor's Bidding Strategy (2001)The Effect of Client and Type and Size of…An Introduction to Building Procurement Systems (2010)An Introduction to Building P…An Introduction to Building Procurement Systems (2003)An Introduction to Building P…Strategic Management in Construction (2002)Strategic Management in Const…Strategic Management in Construction (2001)Strategic Management in Const…The effect of contract type and size on competitiveness in bidding (1997)The effect of contract type a…Factors considered in tendering decisions by top UK contractors (1993)Factors considered in tenderi…BID EVALUATION FOR UK PUBLIC SECTOR CONSTRUCTION CONTRACTS. (1990)BID EVALUATION FOR UK PUBLIC …A Competitive-Bidding Strategy (1956)A Competitive-Bidding StrategyBidding Strategy in Construction Public Procurement: A Contractor’s Perspective (2021)Bidding Strategy in Construct…Exploring the Sources of Contractors’ Competitive Advantage on International HSR Construction Projects (2018)Exploring the Sources of Cont…Protocol to Enhance Profitability by Managing Risks in Construction Projects (2014)Protocol to Enhance Profitabi…Factors affecting the bid/no bid decision in the Palestinian construction industry (2010)Factors affecting the bid/no …Competitor analysis in construction bidding (2010)Competitor analysis in constr…BID/ NO-BID DECISION MODELLING FOR CONSTRUCTION PROJECTS (2006)BID/ NO-BID DECISION MODELLIN…The effect of experience on contractors' competitiveness in recurrent bidding (2002)The effect of experience on c…Criteria for contractor selection (1997)Contractor selection using multicriteria utility theory: An additive model (1998)Strategic Management and Business Policy (2005)Factors Affecting Contractors’ Bidding Decisions for Construction Projects in Saudi Arabia (2019)Questionnaire Survey on Bidding in Construction (1988)Analysis of Panel Data (2003)On competitive bidding: Scoring and position probability graphs (2012)Detecting abnormal and collusive bids in capped tendering (2013)The economics of industrial organization (1979)The Social Psychology of Organizations. (1979)Exploring corporate strategy (1997)Awarding Construction Contracts on Multicriteria Basis in China (2004)Factors influencing the construction time of civil engineering projects in Malaysia (2006)Competitive strategy revisited: contested concepts and dynamic capabilities (2008)Capturing the Impact of COVID-19 on Construction Projects in Developing Countries: A Case Study of Iraq (2021)Project Procurement System Selection Model (2000)Application of Delphi method in selection of procurement systems for construction projects (2001)Procurement innovation for a circular economy of construction and demolition waste: Lessons learnt from Suzhou, China (2019)Applying multi-attribute analysis to contractor selection decisions (1994)Neural network model for contractors' prequalification for local authority projects (1999)Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences (2001)Modeling Competitive Bidding: A Critical Essay (1994)Auctions for conservation contracts: an empirical examination of Victoria's BushTender trial (2003)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)A survey of current cost estimating practices in the UK (2000)Compressing construction durations: lessons learned from Hong Kong building projects (2002)Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach (2004)Dynamic Modeling for Construction Innovation (2004)Subcontracting and its ramifications: A survey of the building industry in Hong Kong (2008)Competition Environment, Strategy, and Performance in the Hong Kong Construction Industry (2011)An evaluation of clients' needs and responsibilities in the construction process (1995)Comparing contributors to time and cost performance in building projects (1998)Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies (2002)
this work references cited by second hop

References

  • 1956A Competitive-Bidding Strategy527 cited
  • 1993Factors considered in tendering decisions by top UK contractors272 cited
  • 2003An Introduction to Building Procurement Systems249 cited
  • 2002Strategic Management in Construction146 cited
  • 2010An Introduction to Building Procurement Systems115 cited
  • 1997The effect of contract type and size on competitiveness in bidding105 cited
  • 2001Strategic Management in Construction94 cited
  • 1990BID EVALUATION FOR UK PUBLIC SECTOR CONSTRUCTION CONTRACTS.78 cited

Cited by

  • 2010Factors affecting the bid/no bid decision in the Palestinian construction industry55 cited
  • 2010Competitor analysis in construction bidding50 cited
  • 2002The effect of experience on contractors' competitiveness in recurrent bidding49 cited
  • 2006BID/ NO-BID DECISION MODELLING FOR CONSTRUCTION PROJECTS44 cited
  • 2021Bidding Strategy in Construction Public Procurement: A Contractor’s Perspective41 cited
  • 2014Protocol to Enhance Profitability by Managing Risks in Construction Projects39 cited
  • 2018Exploring the Sources of Contractors’ Competitive Advantage on International HSR Construction Projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

39 cited