SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Examining dampening effects for alternative dampening procedures to cope with system nervousness
14 references·0 citing·38 second hop
Examining dampening effects for alternative dampening procedures to cope with system nervousness (2005)Examining dampening effects for alternati…Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness (2002)Evaluating dampening effects …Safety production plans in MRP-systems using transform methodology (1996)Safety production plans in MR…Evaluating the impact of frequent engineering changes on MRP system performance (1994)Evaluating the impact of freq…Simulation studies in JIT production (1992)Simulation studies in JIT pro…Survey of MRP nervousness issues (1986)Survey of MRP nervousness iss…A Comparison of Strategies to Dampen Nervousness in MRP Systems (1986)A Comparison of Strategies to…MRP and inventories (1985)MRP and inventoriesResolving uncertainty in manufacturing systems (1984)Resolving uncertainty in manu…A simulation-based experimental investigation of supply/timing uncertainty in MRP systems (1984)A simulation-based experiment…Improved Heuristics for Multi-Stage Requirements Planning Systems (1982)Improved Heuristics for Multi…Material Requirements Planning (1978)Material Requirements PlanningMATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)MATERIAL REQUIREMENTS PLANNIN…Computer Augmented Cases in Operations and Logistics Management (1973)Computer Augmented Cases in O…Michigan State University (1966)Michigan State UniversityToyota production system and Kanban system Materialization of just-in-time and respect-for-human system (1977)Decision Systems for Inventory Management and Production Planning (1979)Measuring uncertainties in MRP environments (2000)Measuring system performance of an ERP-based supply chain (2006)Revisiting rescheduling: MRP nervousness and the bullwhip effect (2016)Desiǵn and analysis of Pull System, a method of multi-staǵe production control (1981)Toyota Production System: Practical Approach to Production Management (1983)Kanban, MRP, and Shaping the Manufacturing Environment (1987)Computer simulation of a PCB production line: metamodeling approach (2000)A methodology to customize pull control systems (2001)Performance measurement system for lean manufacturing: a perspective from SMEs (2008)A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach (1969)The Joint Replenishment Problem with a Powers-of-Two Restriction (1985)Analysis of Multistage Production Systems (1988)Models for multi-plant coordination (1993)Dynamic Version of the Economic Lot Size Model (2004)Optimal Policies for a Multi-Echelon Inventory Problem (2004)The GASP IV simulation language (1974)Generalized newsboy model to compute the optimal planned lead times in assembly systems (2002)Uncertainty under MRP-planned manufacture: Review and categorization (2002)The MPS parameterization under lead time uncertainty (2003)Optimal Policies for a Multi-Echelon Inventory Problem (1960)MRP with uncertainty: a review and some extensions (1991)Managing demand uncertainty through order overplanning (1995)The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case (2003)Production and inventory management (1983)Manufacturing Planning and Control Systems (1984)Manufacturing Planning and Control Systems. (1990)Modelling production opportunities — an historical overview (1995)Stochastic properties of a production—inventory process with planned production using transform methodology (1996)An Overview of Input-Output Analysis Applied to Production-Inventory Systems (2000)Supply planning under uncertainties in MRP environments: A state of the art (2007)Safety Stock versus Safety Time in MRP Controlled Production Systems (1994)Inventory lot-sizing with supplier selection (2003)Global Logistics Partnership Negotiation (1992)Assemble‐to‐order manufacturing: Implications for materials management (1984)Vendor Performance and Alternative Manufacturing Environments* (1990)A GENERAL APPROACH FOR COORDINATING PRODUCTION IN MULTIPLE‐CELL MANUFACTURING SYSTEMS (1992)
this work references cited by second hop

References

  • 1978Material Requirements Planning300 cited
  • 1976MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY291 cited
  • 1982Improved Heuristics for Multi-Stage Requirements Planning Systems212 cited
  • 1986A Comparison of Strategies to Dampen Nervousness in MRP Systems201 cited
  • 1966Michigan State University82 cited
  • 1985MRP and inventories75 cited
  • 1984A simulation-based experimental investigation of supply/timing uncertainty in MRP systems71 cited
  • 1992Simulation studies in JIT production70 cited
  • 1984Resolving uncertainty in manufacturing systems51 cited
  • 1996Safety production plans in MRP-systems using transform methodology46 cited
  • 1994Evaluating the impact of frequent engineering changes on MRP system performance40 cited
  • 1986Survey of MRP nervousness issues27 cited
  • 2002Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness20 cited
  • 1973Computer Augmented Cases in Operations and Logistics Management9 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work