SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Project Management in Construction: Software Use and Research Directions
3 references·15 citing·48 second hop
Project Management in Construction: Software Use and Research Directions (2001)Project Management in Construction: Softw…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…A survey on the resource-constrained project scheduling problem (1995)A survey on the resource-cons…Marketing research in a marketing environment (1990)Marketing research in a marke…Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem (2016)Pareto Front Particle Swarm O…Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Discrete particle swarm optim…The Practice of Time Management on Construction Project (2015)The Practice of Time Manageme…Multi-project scheduling with two-stage decomposition (2014)Multi-project scheduling with…Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling (2014)Hybrid Genetic Algorithm with…Understanding Construction Delay Analysis and the Role of Preconstruction Programming (2013)Understanding Construction De…Project Network Interdependency Alignment: New Approach to Assessing Project Effectiveness (2010)Project Network Interdependen…Critical Path Segments Scheduling Technique (2010)Critical Path Segments Schedu…Improving megaproject briefing through enhanced collaboration with ICT (2009)Improving megaproject briefin…Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method (2009)Construction Project Scheduli…The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem (2008)The effectiveness of resource…Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization (2008)Resource-constrained critical…Implementing information systems with project teams using ethnographic–action research (2008)Implementing information syst…Factors influencing the selection of delay analysis methodologies (2007)Factors influencing the selec…Parallel Computing Framework for Optimizing Construction Planning in Large-Scale Projects (2005)Parallel Computing Framework …Project Management: Techniques in Planning and Controlling Construction Projects (1984)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Project cost–quality–risk tradeoff analysis in a time-constrained problem (2016)Designing a hybrid system dynamic model for analyzing the impact of strategic alignment on project portfolio selection (2018)A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling (2020)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)Journal of Industrial Engineering (2017)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Resource-constrained project scheduling: A survey of recent developments (1998)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs (2013)Improved Critical Chain Project Management Framework for Scheduling Construction Projects (2014)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Some Properties of Schedules for Large Projects with Limited Resources (1964)Project Management With Cpm, Pert and Precedence Diagramming (1983)Decision Making in a Fuzzy Environment (2007)Fuzzy Enabled Hybrid Genetic Algorithm–Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning (2011)Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution (2019)PSPLIB - A project scheduling problem library (1997)Ant colony optimization for resource-constrained project scheduling (2002)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Multi-mode resource-constrained project scheduling problem with alternative project structures (2018)A hyper-heuristic based ensemble genetic programming approach for stochastic resource constrained project scheduling problem (2020)Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm (2021)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project management in construction (1985)The Management of Projects (1994)Networks in engineering: an emerging approach to project organization studies (2012)Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects (2016)Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach (2021)Case Study Research: Design and Methods (1984)Qualitative Data Analysis: An Expanded Sourcebook (1994)Diffusion of Innovations 1 (2019)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization (2018)Time–cost–quality trade-off analysis for planning construction projects (2019)Extensions of the resource-constrained project scheduling problem (2023)On assuring valid measures for theoretical models using survey data (2003)Consumer attitudes towards domestic solar power systems (2005)Trade promotion and SME export performance (2006)
this work references cited by second hop

References

  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1995A survey on the resource-constrained project scheduling problem314 cited
  • 1990Marketing research in a marketing environment272 cited

Cited by

  • 2008Implementing information systems with project teams using ethnographic–action research135 cited
  • 2016Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem122 cited
  • 2008Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization107 cited
  • 2010Project Network Interdependency Alignment: New Approach to Assessing Project Effectiveness103 cited
  • 2008The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem98 cited
  • 2014Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling78 cited
  • 2009Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method69 cited
  • 2007Factors influencing the selection of delay analysis methodologies67 cited
  • 2010Critical Path Segments Scheduling Technique61 cited
  • 2016Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem60 cited
  • 2009

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Improving megaproject briefing through enhanced collaboration with ICT
58 cited
  • 2015The Practice of Time Management on Construction Project54 cited
  • 2014Multi-project scheduling with two-stage decomposition49 cited
  • 2013Understanding Construction Delay Analysis and the Role of Preconstruction Programming47 cited
  • 2005Parallel Computing Framework for Optimizing Construction Planning in Large-Scale Projects42 cited