SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
The Computation of the Unrestricted AOQL When Defective Material is Removed but Not Replaced
1 references·1 citing·8 second hop
The Computation of the Unrestricted AOQL When Defective Material is Removed but Not Replaced (1969)The Computation of the Unrestricted AOQL …Markovian Decision Models for the Evaluation of a Large Class of Continuous Sampling Inspection Plans (1965)Markovian Decision Models for…Continuous Sampling Plans (2005)Continuous Sampling PlansA Sampling Inspection Plan for Continuous Production (1943)Multi-Level Continuous Sampling Plans (1955)Tightened Multi-Level Continuous Sampling Plans (1957)Application of renewal theory to continuous sampling plans (1985)The Economic Design of Continuous Inspection Procedures: A Review Paper (1973)A Note on Unrestricted AOQLs (1975)Additional Continuous Sampling Inspection Plans (1977)Numerical Methods for Stochastic Control Problems in Continuous Time (1990)
this work references cited by second hop

References

  • 1965Markovian Decision Models for the Evaluation of a Large Class of Continuous Sampling Inspection Plans13 cited

Cited by

  • 2005Continuous Sampling Plans6 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work