A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
11 references·1 citing·31 second hop
A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows (2014)A lagrangian relaxation and ACO hybrid fo…Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach (2009)Optimizing Discounted Cash Fl…A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (2009)A scatter search heuristic fo…Replenishment Planning for Stochastic Inventory Systems with Shortage Cost (2007)Replenishment Planning for St…Project Scheduling with Time Windows and Scarce Resources (2003)Project Scheduling with Time …Project Scheduling: A Research Handbook (2002)Project Scheduling: A Researc…Ant colony optimization for resource-constrained project scheduling (2002)Ant colony optimization for r…On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (2001)On Maximizing the Net Present…Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds (2001)Maximizing the Net Present Va…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…An iterative scheduling technique for resource-constrained project scheduling (1992)An iterative scheduling techn…An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)An updated survey of variants…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Ant colony optimization for disaster relief operations (2007)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Project Management With Cpm, Pert and Precedence Diagramming (1983)Project management — A managerial approach (1989)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Critical-Path Planning and Scheduling: Mathematical Basis (1961)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives (2012)Payment models and net present value optimization for resource-constrained project scheduling (2015)An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem (2021)Chance-Constrained Programming (1959)Inventory management and production planning and scheduling (1999)Modeling International Financial Returns with a Multivariate Regime-switching Copula (2009)Financial constraints in China: Firm-level evidence (2010)Disaster relief routing: Integrating research and practice (2011)Introduction to Stochastic Programming (2011)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (2022)Resource-constrained multi-project scheduling problem: A survey (2022)Extensions of the resource-constrained project scheduling problem (2023)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)A Simulation-Based Process Model for Managing Complex Design Projects (2005)Robust and reactive project scheduling: a review and classification of procedures (2004)
this work references cited by second hop

References

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2002Ant colony optimization for resource-constrained project scheduling760 cited
  • 2002Project Scheduling: A Research Handbook716 cited
  • 2007Replenishment Planning for Stochastic Inventory Systems with Shortage Cost401 cited
  • 2003Project Scheduling with Time Windows and Scarce Resources305 cited
  • 1992An iterative scheduling technique for resource-constrained project scheduling263 cited
  • 2001On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints132 cited
  • 2009Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach89 cited
  • 2009A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows57 cited
  • 2001Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds49 cited

Cited by

  • 2021An updated survey of variants and extensions of the resource-constrained project scheduling problem367 cited