SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning
1 references·16 citing·37 second hop
Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning (2000)Run length, average run length and false …The Effect of Sample Size on Estimated Limits forXandXControl Charts (1993)The Effect of Sample Size on …Two perspectives for designing a phase II control chart with estimated parameters: The case of the Shewhart X¯ Chart (2019)Two perspectives for designin…On designing a new Tukey-EWMA control chart for process monitoring (2015)On designing a new Tukey-EWMA…Effect of the Amount of Phase I Data on the Phase II Performance ofS2andSControl Charts (2015)Effect of the Amount of Phase…Phase II Shewhart-type Control Charts for Monitoring Times Between Events and Effects of Parameter Estimation (2014)Phase II Shewhart-type Contro…A Reevaluation of the Adaptive Exponentially Weighted Moving Average Control Chart When Parameters are Estimated (2014)A Reevaluation of the Adaptiv…Control Charts for Simultaneous Monitoring of Unknown Mean and Variance of Normally Distributed Processes (2013)Control Charts for Simultaneo…Nonparametric control charts based on runs and Wilcoxon-type rank-sum statistics (2009)Nonparametric control charts …Design issues for adaptive control charts (2008)Design issues for adaptive co…A nonparametric control chart based on the Mann-Whitney statistic (2008)A nonparametric control chart…The Rate of False Signals in Ū Control Charts with Estimated Limits (2007)The Rate of False Signals in …Run Length Distribution and Percentiles: The Shewhart Chart with Unknown Parameters (2007)Run Length Distribution and P…Parameter estimation and design considerations in prospective applications of theX¯ chart (2006)Parameter estimation and desi…Empirical Non-Parametric Control Charts: Estimation Effects and Corrections (2004)Empirical Non-Parametric Cont…Cumulative conformance count chart with sequentially updated parameters (2004)Cumulative conformance count …Parametric control charts (2003)Parametric control chartsAre estimated control charts in control? (2003)Are estimated control charts …The Shewhart Control Chart—Tests for Special Causes (1984)EWMA Control Charts for Monitoring the Mean of Autocorrelated Processes (1999)The Performance of Exponentially Weighted Moving Average Charts With Estimated Parameters (2001)A control chart based on a change-point model for monitoring linear profiles (2006)Introduction to Statistical Quality Control (1992)Research Issues and Ideas in Statistical Process Control (1999)Introduction to Statistical Quality Control (2001)Nonparametric control chart based on change-point model (2007)A Nonparametric EWMA Sign Chart for Location Based on Individual Measurements (2011)Number of Replications Required in Monte Carlo Simulation Studies: A Synthesis of Four Studies (2011)Control Chart Tests Based on Geometric Moving Averages (1959)Exponentially Weighted Moving Average Control Schemes: Properties and Enhancements (1990)Introduction to Statistical Quality Control (2005)Adaptive Control Charts: Recent Developments and Extensions (2015)Guaranteed conditional performance of theS2control chart with estimated parameters (2015)Optimal design of the adaptive EWMA chart for the mean based on median run length and expected median run length (2018)Effects of Parameter Estimation on Control Chart Properties: A Literature Review (2006)A nonparametric exponentially weighted moving average signed-rank chart for monitoring location (2011)Shewhart x-charts with estimated process variance (1981)Guaranteed In-Control Performance for the Shewhart X and X Control Charts (2017)Statistical Methods for Quality Improvement (2000)DESIGN OF THE c AND np CHARTS WHEN THE PARAMETERS ARE ESTIMATED (2012)Shewhart control charts for dispersion adjusted for parameter estimation (2017)Financial impacts of innovation in Six Sigma projects (2019)Understanding Statistical Process Control (1993)Monitoring the Coefficient of Variation Using a Variable Sampling Interval EWMA Chart (2017)An Overview of Phase I Analysis for Process Improvement and Monitoring (2014)A distribution-free Shewhart-type Mann–Whitney control chart for monitoring finite horizon productions (2020)Outliers Detection Models in Shewhart Control Charts; an Application in Photolithography: A Semiconductor Manufacturing Industry (2020)A one-sided adaptive truncated exponentially weighted moving average scheme for time between events (2022)Economic Control of Quality of Manufactured Product. (1932)EWMA-type scheme for monitoring location parameter using auxiliary information (2017)Linear profile monitoring using EWMA structure under ranked set schemes (2017)Mixed Tukey EWMA-CUSUM control chart and its applications (2017)A phase II nonparametric control chart based on precedence statistics with runs-type signaling rules (2008)Distribution-Free Exceedance CUSUM Control Charts for Location (2012)Design and implementation of CUSUM exceedance control charts for unknown location (2014)
this work references cited by second hop

References

  • 1993The Effect of Sample Size on Estimated Limits forXandXControl Charts323 cited

Cited by

  • 2007Run Length Distribution and Percentiles: The Shewhart Chart with Unknown Parameters112 cited
  • 2008A nonparametric control chart based on the Mann-Whitney statistic109 cited
  • 2015On designing a new Tukey-EWMA control chart for process monitoring92 cited
  • 2003Are estimated control charts in control?82 cited
  • 2014A Reevaluation of the Adaptive Exponentially Weighted Moving Average Control Chart When Parameters are Estimated81 cited
  • 2015Effect of the Amount of Phase I Data on the Phase II Performance ofS2andSControl Charts71 cited
  • 2019Two perspectives for designing a phase II control chart with estimated parameters: The case of the Shewhart X¯ Chart70 cited
  • 2003Parametric control charts68 cited
  • 2006Parameter estimation and design considerations in prospective applications of theX¯ chart65 cited
  • 2008Design issues for adaptive control charts59 cited
  • 2007The Rate of False Signals in Ū Control Charts with Estimated Limits51 cited
  • 2013Control Charts for Simultaneous Monitoring of Unknown Mean and Variance of Normally Distributed Processes46 cited
  • 2014Phase II Shewhart-type Control Charts for Monitoring Times Between Events and Effects of Parameter Estimation

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

44 cited
  • 2004Empirical Non-Parametric Control Charts: Estimation Effects and Corrections44 cited
  • 2009Nonparametric control charts based on runs and Wilcoxon-type rank-sum statistics43 cited
  • 2004Cumulative conformance count chart with sequentially updated parameters41 cited