SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Sustainable workforce scheduling in construction program management
16 references·1 citing·46 second hop
Sustainable workforce scheduling in construction program management (2012)Sustainable workforce scheduling in const…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…Development of composite sustainability performance index for steel industry (2006)Development of composite sust…Multimode Project Scheduling Based on Particle Swarm Optimization (2005)Multimode Project Scheduling …Disruption management for resource-constrained project scheduling (2004)Disruption management for res…Human Resource Management in Construction Projects: Strategic and Operational Approaches (2003)Human Resource Management in …Human Resource Management in Construction Projects (2003)Human Resource Management in …Assessing the sustainability performances of industries (2003)Assessing the sustainability …Assignment and Allocation Optimization of Partially Multiskilled Workforce (2002)Assignment and Allocation Opt…Project Scheduling with Multiple Modes: A Genetic Algorithm (2001)Project Scheduling with Multi…Optimizing Resource Utilization for Repetitive Construction Projects (2001)Optimizing Resource Utilizati…UK construction skills shortage response strategies and an analysis of industry perceptions (2000)UK construction skills shorta…Multiskilled Labor Utilization Strategies in Construction (1998)Multiskilled Labor Utilizatio…Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)Multi-mode resource-constrain…Effects of human resource management on project effectiveness and success: Toward a new conceptual framework (1998)Effects of human resource man…Construction Productivity Improvement (1987)Construction Productivity Imp…Multiobjective Decision Making: Theory and Methodology (1983)Multiobjective Decision Makin…Crew Allocation System for the Masonry Industry (2017)Crew Allocation System for th…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (2003)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)International business and society (1998)An exploration of measures of social sustainability and their application to supply chain decisions (2008)Corporate sustainability strategies: sustainability profiles and maturity levels (2010)A scientometric review of global research on sustainability and sustainable development (2018)RPM: Repetitive Project Modeling (1990)Resource-Activity Critical-Path Method for Construction Planning (2003)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)The External Control of Organizations. (1978)The Effects of Group Longevity on Project Communication and Performance (1982)Strategy and Structure: (1986)Project success: a multidimensional, strategic concept (1997)Cohesion and Performance (2009)Future criteria for success of building projects in Malaysia (2010)The Analytic Hierarchy Process (1985)How to Make a Decision: The Analytic Hierarchy Process (1994)Human Development Report (2001)Multi-criteria evaluation model for the selection of sustainable materials for building projects (2012)A framework for sustainable performance assessment of supply chain management practices (2014)Using project management as a way to sustainability. From a comprehensive review to a framework definition (2015)Modeling Construction Labor Productivity (1990)THE CONSTRUCTION INDUSTRY INSTITUTE (1990)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimizing linear project scheduling with multi-skilled crews (2012)A review of methods and algorithms for optimizing construction scheduling (2013)Engineering Approach Using ANN to Improve and Predict Construction Labor Productivity under Different Influences (2017)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)An evidential reasoning approach for multiple-attribute decision making with uncertainty (1994)The Analytic Hierarchy Process—An Exposition (2001)Multiple Criteria Optimization: State of the Art Annotated Bibliographic Surveys (2002)‘It’s good to be angry’: Enacting anger in construction project management to achieve perceived leader effectiveness (2010)A Critical Examination of the Relationship between Emotional Intelligence and Transformational Leadership (2010)A framework for examining the dimensions and characteristics of complexity inherent within rail megaprojects (2016)
this work references cited by second hop

References

  • 1983Multiobjective Decision Making: Theory and Methodology2,377 cited
  • 2003Assessing the sustainability performances of industries1,051 cited
  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem901 cited
  • 2006Development of composite sustainability performance index for steel industry446 cited
  • 2001Project Scheduling with Multiple Modes: A Genetic Algorithm286 cited
  • 1998Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm242 cited
  • 1998Effects of human resource management on project effectiveness and success: Toward a new conceptual framework231 cited
  • 2003Human Resource Management in Construction Projects: Strategic and Operational Approaches198 cited
  • 2002Assignment and Allocation Optimization of Partially Multiskilled Workforce169 cited
  • 2001Optimizing Resource Utilization for Repetitive Construction Projects161 cited
  • 1987Construction Productivity Improvement148 cited
  • 2003Human Resource Management in Construction Projects147 cited
  • 2004Disruption management for resource-constrained project scheduling137 cited
  • 2005Multimode Project Scheduling Based on Particle Swarm Optimization123 cited
  • 1998

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Multiskilled Labor Utilization Strategies in Construction
109 cited
  • 2000UK construction skills shortage response strategies and an analysis of industry perceptions107 cited
  • Cited by

    • 2017Crew Allocation System for the Masonry Industry31 cited