SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Comparative Study of University Courses on Critical-Path Method Scheduling
16 references·0 citing·28 second hop
Comparative Study of University Courses on Critical-Path Method Scheduling (2006)Comparative Study of University Courses o…Project Management Institute (PMI) (2004)Project Management Institute …Construction Management Fundamentals (2004)Construction Management Funda…Earned value in project management (2003)Earned value in project manag…Project Management in Practice (2001)Project Management in PracticeNetwork Scheduling Techniques for Construction Project Management (1997)Network Scheduling Techniques…Construction Planning and Scheduling (1997)Construction Planning and Sch…Project Management for Engineering and Construction (1993)Project Management for Engine…Construction Scheduling: Preparation, Liability, and Claims (1991)Construction Scheduling: Prep…Construction Project Scheduling (1991)Construction Project Scheduli…Productivity improvement in construction (1988)Productivity improvement in c…Project Management: Techniques in Planning and Controlling Construction Projects (1984)Project Management: Technique…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Professional Construction Management (1976)Professional Construction Man…Critical path methods in construction practice (1970)Critical path methods in cons…Management Guide to PERT/CPM (1969)Management Guide to PERT/CPMPrecedence and Arrow Networking Techniques for Construction (1980)Comparison of Delay Analysis Methodologies (1998)Work Continuity Constraints in Project Scheduling (2005)Evolutionary resource scheduler for linear projects (2007)Line‐of‐Balance Scheduling in Pavement Construction (1986)Scheduling Projects with Repeating Activities (1998)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Resource-Activity Critical-Path Method for Construction Planning (2003)Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects (2005)Fuzzy Monte Carlo Simulation and Risk Assessment in Construction (2009)Dynamic modeling of product development processes (1998)Resource-constrained project scheduling: A survey of recent developments (1998)An integrated survey of deterministic project scheduling (2001)An exploration towards a production theory and its application to construction (2000)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Large construction projects in developing countries: a case study from Vietnam (2004)Project Scope and Project Performance: The Effect of Parts Strategy and Supplier Involvement on Product Development (1989)A model-based method for organizing tasks in product development (1994)The Underlying Theory of Project Management Is Obsolete (2008)Earned Value Project Management Method and Extensions (2003)Assessing and Moving on From the Dominant Project Management Discourse in the Light of Project Overruns (2005)THE HANDBOOK OF PROJECT-BASED MANAGEMENT (2008)Total quality management in the construction process (1997)Impact of Job Stressors and Stress on the Safety Behavior and Accidents of Construction Workers (2015)Success Criteria and Factors for International Development Projects: A Life-Cycle-Based Framework (2008)A Model of Project Knowledge Management (2011)Exploring the front-end of project management (2013)Construction delay: a quantitative analysis (2000)
this work references cited by second hop

References

  • 1988Productivity improvement in construction519 cited
  • 2003Earned value in project management418 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1976Professional Construction Management317 cited
  • 1969Management Guide to PERT/CPM304 cited
  • 1984Project Management: Techniques in Planning and Controlling Construction Projects232 cited
  • 1993Project Management for Engineering and Construction215 cited
  • 2004Project Management Institute (PMI)163 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1991Construction Project Scheduling149 cited
  • 1970Critical path methods in construction practice145 cited
  • 2001Project Management in Practice110 cited
  • 1997Construction Planning and Scheduling106 cited
  • 1997Network Scheduling Techniques for Construction Project Management70 cited
  • 2004Construction Management Fundamentals68 cited
  • 1991Construction Scheduling: Preparation, Liability, and Claims51 cited

Cited by

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

No citing works inside the corpus for this window.