SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Workflow technology-based monitoring and control for business process and project management
3 references·1 citing·16 second hop
Workflow technology-based monitoring and control for business process and project management (1996)Workflow technology-based monitoring and …ObjectFlow: Towards a process management infrastructure (1996)ObjectFlow: Towards a process…Project management: engineering, technology, and implementation (1994)Project management: engineeri…Process innovation: reengineering work through information technology (1993)Process innovation: reenginee…Moderating Effect of Organizational Learning Type on Performance Improvement (2008)Moderating Effect of Organiza…Organizational Learning: The Contributing Processes and the Literatures (1991)Management research: An introduction (1992)Building the Learning Organization (1995)Facing Turbulence: Driving Force for Construction Organizations to Regain Unlearning and Learning Traction (2011)Incorporating the learning effect into data envelopment analysis to measure MSW recycling performance (2013)The Influence of Project Risk Management Maturity and Organizational Learning on the Success of Power Plant Construction Projects (2018)Reengineering the corporation: A manifesto for business revolution (1993)Workflow and Transactions in InConcert. (1993)Simulation modeling within workflow technology (1995)Activity flow: Towards incremental specification and flexible coordination of workflow activities (1997)The Capabilities of Market-Driven Organizations (1994)A Resource-Based Perspective on Information Technology Capability and Firm Performance: An Empirical Investigation1 (2000)DEFINING SUPPLY CHAIN MANAGEMENT (2001)Managing multi-project environments through constant work-in-process (2002)Project management competence development framework in turbulent business environment (2004)Time-Cost Optimization of Construction Projects with Generalized Activity Constraints (2005)
this work references cited by second hop

References

  • 1993Process innovation: reengineering work through information technology4,378 cited
  • 1994Project management: engineering, technology, and implementation176 cited
  • 1996ObjectFlow: Towards a process management infrastructure37 cited

Cited by

  • 2008Moderating Effect of Organizational Learning Type on Performance Improvement25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work