SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Expert System for Equipment Selection for Earth‐Moving Operations
0 references·6 citing·22 second hop
Expert System for Equipment Selection for Earth‐Moving Operations (1992)Expert System for Equipment Selection for…Equipment Selection Using Fuzzy Multi Criteria Decision Making Model: Key Study of Gole Gohar Iron Min (2012)Equipment Selection Using Fuz…Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method (2004)Selection of Concrete Pump Us…ESTIVATE: a model for calculating excavator productivity and output costs (2000)ESTIVATE: a model for calcula…A neural network based system for predicting earthmoving production (1999)A neural network based system…Artificial intelligence technologies for robot assisted urban search and rescue (1996)Artificial intelligence techn…Computer‐Aided Equipment Selection for Transporting and Placing Concrete (1993)Computer‐Aided Equipment Sele…Models of UK private sector quarterly construction demand (1994)The rise of the expert company (1988)Workflow study on human-robot interaction in USAR (2003)Adaptive multi-agent relief assessment and emergency response (2017)Can we detect trends in natural disaster management with artificial intelligence? A review of modeling practices (2020)Fuzzy sets (1965)The Analytic Hierarchy Process (1985)Fuzzy sets (1996)AN INTEGRATED FUZZY MULTI CRITERIA GROUP DECISION MAKING MODEL FOR HANDLING EQUIPMENT SELECTION (2014)Selection of Construction Equipment by using Multi-criteria Decision Making Methods (2017)Application of MCDM methods for flotation machine selection (2019)Introduction to simulation and SLAM II (1979)Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Resource-Based Modeling for Construction Simulation (1997)Model for Efficient Risk Allocation in Privately Financed Public Infrastructure Projects Using Neuro-Fuzzy Techniques (2011)Comparative study of delay factors in Libyan and the UK construction industry (2012)Productivity estimation of bulldozers using generalized linear mixed models (2014)A systematic approach to the selection of an appropriate crane for a construction site (1985)Hybrid Expert System for Construction Planning and Scheduling (1990)The analytic hierarchy process : planning, priority setting, resource allocation (1980)How to select and how to rank projects: The Promethee method (1986)Remarks on the Analytic Hierarchy Process (1990)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1999A neural network based system for predicting earthmoving production68 cited
  • 2012Equipment Selection Using Fuzzy Multi Criteria Decision Making Model: Key Study of Gole Gohar Iron Min66 cited
  • 1996Artificial intelligence technologies for robot assisted urban search and rescue62 cited
  • 2000ESTIVATE: a model for calculating excavator productivity and output costs47 cited
  • 2004Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method43 cited
  • 1993Computer‐Aided Equipment Selection for Transporting and Placing Concrete18 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work