Decision support model for incentives/disincentives time–cost tradeoff
8 references·0 citing·23 second hop
Decision support model for incentives/disincentives time–cost tradeoff (2011)Decision support model for incentives/dis…Grand challenges for engineering (2009)Grand challenges for engineer…Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies (2005)Computer Simulation Model: Co…A method to determine minimum contract bids for incentive highway projects (2003)A method to determine minimum…Incentive/Disincentive Contracts: Perceptions of Owners and Contractors (1998)Incentive/Disincentive Contra…Incentive/Disincentive Provisions in Highway Contracts (1997)Incentive/Disincentive Provis…Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Time Is Money: Innovative Con…Incentive/Disincentive Guidelines for Highway Construction Contracts (1995)Incentive/Disincentive Guidel…Schedule‐Based Construction Incentives (1989)Schedule‐Based Construction I…Construction Project Scheduling (1991)Optimal Bid Model for Price-Time Biparameter Construction Contracts (1999)Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects (2011)Scoring Rules and Competitive Behavior in Best-Value Construction Auctions (2016)Constructing Incentive Schemes for Government Contracts: An Application of Agency Theory. (1992)A+B Bidding Method—Hidden Success Story for Highway Construction (1995)Benchmarking contractor selection practices in public-sector construction-a proposed model (2000)Evaluation of Alternative Contracting Techniques on FDOT Construction Projects (2007)Incentives in the Chinese Construction Industry (2008)Project Management With Cpm, Pert and Precedence Diagramming (1983)Multi-agent-based simulation system for construction operations with congested flows (2010)Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis (2011)Incorporating Road User Costs into Integrated Life-Cycle Cost Analyses for Infrastructure Sustainability: A Case Study on Sr-91 Corridor Improvement Project (Ca) (2018)Success DNA of a Record-Breaking Megaproject (2020)A Comparison of Buyer-Determined and Price-Based Multiattribute Mechanisms (2007)Court Efficiency and Procurement Performance (2017)Causes of schedule delays in construction projects in Algeria (2018)Situated Engineering Learning: Bridging Engineering Education Research and the Learning Sciences (2011)Appraising research on personalized learning: Definitions, theoretical alignment, advancements, and future directions (2020)A Systematic Review of Research on Personalized Learning: Personalized by Whom, to What, How, and for What Purpose(s)? (2021)Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects (2004)Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique (2013)Time overruns as opportunistic behavior in public procurement (2013)
this work references cited by second hop

References

  • 2009Grand challenges for engineering363 cited
  • 1995Time Is Money: Innovative Contracting Methods in Highway Construction159 cited
  • 1998Incentive/Disincentive Contracts: Perceptions of Owners and Contractors81 cited
  • 1995Incentive/Disincentive Guidelines for Highway Construction Contracts75 cited
  • 2005Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies68 cited
  • 1997Incentive/Disincentive Provisions in Highway Contracts67 cited
  • 1989Schedule‐Based Construction Incentives42 cited
  • 2003A method to determine minimum contract bids for incentive highway projects40 cited