SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Resource-based model for automatic cash-flow forecasting
6 references·5 citing·41 second hop
Resource-based model for automatic cash-flow forecasting (1995)Resource-based model for automatic cash-f…Modern Construction Management (2012)Modern Construction ManagementCompany-Level Cash-Flow Management (1996)Company-Level Cash-Flow Manag…Cost‐ and Schedule‐Control Integration: Issues and Needs (1991)Cost‐ and Schedule‐Control In…Modern construction management (1990)Modern construction managementSimulation applied to construction projects (1984)Simulation applied to constru…Pre-Estimate Cash Flow Analysis (1977)Pre-Estimate Cash Flow Analys…The Strategic Change Matrix and Business Sustainability across COVID-19 (2020)The Strategic Change Matrix a…GA-based multi-objective optimization of finance-based construction project scheduling (2010)GA-based multi-objective opti…Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions (2005)Assessing the Accuracy of Cas…Financing Construction: Cash Flows and Cash Farming (2003)Financing Construction: Cash …Cash flow management in construction firms (2002)Cash flow management in const…Precedence and Arrow Networking Techniques for Construction (1980)An agenda for cost modelling research (1991)Effective construction planning (1994)A CRITICAL REVIEW OF RISK MANAGEMENT SUPPORT TOOLS (2004)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER (2016)Time-cost tradeoff analysis with minimized project financing cost (2018)Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Cost, Schedule, and Time Variances and Integration (1993)Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration (2002)Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control (2006)Cost Planning of Buildings (1970)Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories (2005)Artificial intelligence approaches to achieve strategic control over project cash flows (2008)MANAGING TARGET THE CASH BALANCE IN CONSTRUCTION FIRMS USING A FUZZY REGRESSION APPROACH (2009)An introduction to concept mapping for planning and evaluation (1989)Design and Analysis of Experiments, 5th Ed. (2001)Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing (2010)Case study research: design and methods (2011)Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry (2016)Primary, Secondary, and Meta-Analysis of Research (1976)Handbook of Qualitative Research (1994)Artificial neural network cost flow risk assessment model (2013)Cybernetics or Control and Communication in the Animal and the Machine (2019)The Iron Cage Revisited: Institutional Isomorphism and Collective Rationality in Organizational Fields (1983)Firm Resources and Sustained Competitive Advantage (1991)The theory of planned behavior (1991)La adaptación de las empresas a la realidad COVID: una revisión sistemática (2021)MARKETING DIGITAL EM TEMPOS DE CRISE (2021)Contributors to construction delays (1998)Which contractor selection methodology? (1998)Governmental role in BOT-led infrastructure development (2001)Net cashflow models: Are they reliable? (1991)Review of Unbalanced Bidding Models in Construction (2007)Evaluating prequalification criteria in contractor selection (1994)Reconstructing Cultures for Relational Contracting (2005)Applying Z-score model to distinguish insolvent construction companies in China (2011)
this work references cited by second hop

References

  • 2012Modern Construction Management314 cited
  • 1990Modern construction management142 cited
  • 1996Company-Level Cash-Flow Management75 cited
  • 1991Cost‐ and Schedule‐Control Integration: Issues and Needs74 cited
  • 1977Pre-Estimate Cash Flow Analysis67 cited
  • 1984Simulation applied to construction projects67 cited

Cited by

  • 2005Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions52 cited
  • 2010GA-based multi-objective optimization of finance-based construction project scheduling51 cited
  • 2003Financing Construction: Cash Flows and Cash Farming47 cited
  • 2020The Strategic Change Matrix and Business Sustainability across COVID-1936 cited
  • 2002Cash flow management in construction firms17 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work