Multiresource Leveling in Line-of-Balance Scheduling
16 references·5 citing·32 second hop
Multiresource Leveling in Line-of-Balance Scheduling (2013)Multiresource Leveling in Line-of-Balance…A two-phase GA model for resource-constrained project scheduling (2008)A two-phase GA model for reso…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Resource Optimization Using Combined Simulation and Genetic Algorithms (2003)Resource Optimization Using C…Challenges in Line-of-Balance Scheduling (2002)Challenges in Line-of-Balance…Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Resource Scheduling Using Neu…Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource leveling in construc…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…Linear Scheduling Model: Development of Controlling Activity Path (1998)Linear Scheduling Model: Deve…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …Schedule optimization for scattered repetitive projects (2021)Schedule optimization for sca…Resource Leveling Based on Line of Balance and Constraint Programming (2018)Resource Leveling Based on Li…Minimizing duration and crew work interruptions of repetitive construction projects (2018)Minimizing duration and crew …Survey of quantitative methods in construction (2017)Survey of quantitative method…A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)A Parallel Branch and Bound A…Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Metaheuristics for project and construction management – A state-of-the-art review (2011)A review of methods and algorithms for optimizing construction scheduling (2013)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Optimizing Resource Leveling in Construction Projects (2009)HYBRID NEURAL INTELLIGENT SYSTEM TO PREDICT BUSINESS FAILURE IN SMALL-TO-MEDIUM-SIZE ENTERPRISES (2011)DETECTION OF DRIVING FATIGUE BY USING NONCONTACT EMG AND ECG SIGNALS MEASUREMENT SYSTEM (2013)Scheduling Projects with Repeating Activities (1998)Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation (2018)The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Building effective decision support systems (1982)Decision support and expert systems (1993)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm (2012)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Project Management With Cpm, Pert and Precedence Diagramming (1983)Application of Linear Scheduling (1986)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Construction Project Scheduling (1991)Stochastic Construction Time-Cost Trade-Off Analysis (2000)
this work references cited by second hop

References

  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1998Linear Scheduling Model: Development of Controlling Activity Path168 cited
  • 2002Challenges in Line-of-Balance Scheduling167 cited
  • 1980Precedence and Arrow Networking Techniques for Construction167 cited
  • 2000Resource leveling in construction by genetic algorithm-based optimization and its decision support system application160 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 2001Resource Scheduling Using Neural Dynamics Model of Adeli and Park150 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 2003Resource Optimization Using Combined Simulation and Genetic Algorithms130 cited
  • 2008A two-phase GA model for resource-constrained project scheduling124 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • Cited by

    • 2016A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags41 cited
    • 2018Minimizing duration and crew work interruptions of repetitive construction projects40 cited
    • 2021Schedule optimization for scattered repetitive projects35 cited
    • 2017Survey of quantitative methods in construction34 cited
    • 2018Resource Leveling Based on Line of Balance and Constraint Programming34 cited