Scheduling/Cost Optimization and Neural Dynamics Model for Construction
0 references·16 citing·47 second hop
Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization and Neural D…The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)The Multimode Resource‐Constr…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Automation in construction scheduling: a review of the literature (2015)Automation in construction sc…A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)A Novel Machine Learning Mode…A review of methods and algorithms for optimizing construction scheduling (2013)A review of methods and algor…HYBRID NEURAL INTELLIGENT SYSTEM TO PREDICT BUSINESS FAILURE IN SMALL-TO-MEDIUM-SIZE ENTERPRISES (2011)HYBRID NEURAL INTELLIGENT SYS…Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction (2010)Modeling Framework and Archit…Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization (2009)Integrating Messy Genetic Alg…A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)Time/cost optimization using …Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Optimizing Construction Time …A two-phase GA model for resource-constrained project scheduling (2008)A two-phase GA model for reso…Scheduling Construction Projects Using Evolutionary Algorithm (2006)Scheduling Construction Proje…Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Resource Scheduling Using Neu…OO Information Model for Construction Project Management (1999)OO Information Model for Cons…CONSCOM: An OO Construction Scheduling and Change Management System (1999)CONSCOM: An OO Construction S…Introduction to System Dynamics Modeling with DYNAMO (1997)Creating Computer Simulation Systems: An Introduction to the High Level Architecture (1999)Theory of Modeling and Simulation: Integrating Discrete Event and Continuous Complex Dynamic Systems (2000)Dynamics of Working Hours in Construction (2011)A conceptual framework for hybrid system dynamics and discrete event simulation for healthcare (2013)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Regularization Neural Network for Construction Cost Estimation (1998)Determinants of House Prices in Central and Eastern Europe (2007)Determinants of house prices in Turkey: Hedonic regression versus artificial neural network (2008)House price forecasting with neural networks (2021)Pre-owned housing price index forecasts using Gaussian process regressions (2024)Predictions of residential property price indices for China via machine learning models (2025)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A review of methods, techniques and tools for project planning and control (2018)Time–cost–quality trade-off analysis for planning construction projects (2019)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Project scheduling with resource constraints: A branch and bound approach (1987)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Optimizing Resource Leveling in Construction Projects (2009)DETECTION OF DRIVING FATIGUE BY USING NONCONTACT EMG AND ECG SIGNALS MEASUREMENT SYSTEM (2013)RPM: Repetitive Project Modeling (1990)Scheduling Projects with Repeating Activities (1998)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)GA optimization model for repetitive projects with soft logic (2011)Metaheuristics for project and construction management – A state-of-the-art review (2011)Optimizing linear project scheduling with multi-skilled crews (2012)Design Patterns: Elements of Reusable Object-Oriented Software (1994)Analysis patterns: reusable objects models (1996)Construction project change management in Singapore: Status, importance and impact (2012)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (2013)Memetic algorithm for solving resource constrained project scheduling problems (2019)Professional Construction Management (1976)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)A hybrid algorithm for the university course timetabling problem using the improved parallel genetic algorithm and local search (2020)Ant colony optimization for resource-constrained project scheduling (2002)Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints (2013)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)The organization of behavior. (1950)Human Problem Solving (1972)A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)An effective genetic algorithm for the resource levelling problem with generalised precedence relations (2017)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2015A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units289 cited
  • 2001Resource Scheduling Using Neural Dynamics Model of Adeli and Park150 cited
  • 2013A review of methods and algorithms for optimizing construction scheduling148 cited
  • 2008Optimizing Construction Time and Cost Using Ant Colony Optimization Approach143 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 2008A two-phase GA model for resource-constrained project scheduling124 cited
  • 1999CONSCOM: An OO Construction Scheduling and Change Management System122 cited
  • 2008Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling118 cited
  • 2015Automation in construction scheduling: a review of the literature109 cited
  • 2010Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction103 cited
  • 1999OO Information Model for Construction Project Management79 cited
  • 2011HYBRID NEURAL INTELLIGENT SYSTEM TO PREDICT BUSINESS FAILURE IN SMALL-TO-MEDIUM-SIZE ENTERPRISES77 cited
  • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2006Scheduling Construction Projects Using Evolutionary Algorithm68 cited
  • 2018The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects67 cited
  • 2009Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization65 cited