On computing the latest starting times and floats of activities in a network with imprecise durations
13 references·5 citing·32 second hop
On computing the latest starting times and floats of activities in a network with imprecise durations (2004)On computing the latest starting times an…On latest starting times and floats in activity networks with ill-known durations (2003)On latest starting times and …Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge (2003)Fuzzy scheduling: Modelling f…The computational complexity of the criticality problems in a network with interval activity times (2002)The computational complexity …On the sure criticality of tasks in activity networks with imprecise durations (2002)On the sure criticality of ta…Critical path analysis in the network with fuzzy activity times (2001)Critical path analysis in the…Fuzzy project scheduling system for software development (1994)Fuzzy project scheduling syst…Fuzzy critical path method (1994)Fuzzy critical path methodFuzzy-Network Planning - FNET (1983)Fuzzy-Network Planning - FNETThe use of fuzzy variables in pert (1981)The use of fuzzy variables in…Fuzzy Sets and Systems - Theory and Applications (1980)Fuzzy Sets and Systems - Theo…Using fuzzy set theory in a scheduling problem: A case study (1979)Using fuzzy set theory in a s…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Critical-path planning and scheduling (1959)Critical-path planning and sc…Time–cost trade-off analysis of project networks in fuzzy environments (2011)Time–cost trade-off analysis …Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities (2010)Fuzzy Repetitive Scheduling M…Criticality analysis of activity networks under interval uncertainty (2010)Criticality analysis of activ…Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria (2010)Application of fuzzy multi-at…Computing latest starting times of activities in interval-valued networks with minimal time lags (2009)Computing latest starting tim…Application of a Technique for Research and Development Program Evaluation (1959)Using Ant Colony Optimization algorithm for solving project management problems (2009)A hybrid multi-stage predictive model for supply chain network collapse recovery analysis: a practical framework for effective supply chain network continuity management (2010)Project scheduling under uncertainty using fuzzy modelling and solving techniques (2012)An Analytical Study of the PERT Assumptions (1964)A GA-based fuzzy optimal model for construction time–cost trade-off (2001)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Fuzzy Preference Modelling and Multicriteria Decision Support (1994)Decision Making in a Fuzzy Environment (2007)Closed-loop supply chain network design under a fuzzy environment (2014)A novel robust fuzzy stochastic programming for closed loop supply chain network design under hybrid uncertainty (2017)A robust possibilistic programming framework for designing an organ transplant supply chain under uncertainty (2022)Analysis of fuzzy information (1987)A simple approach to fuzzy critical path analysis in project networks (2007)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Object oriented analysis (1990)A fuzzy robust scheduling approach for product development projects (2003)Applying fuzzy method for measuring criticality in project network (2007)A Q-learning-based memetic algorithm for multi-objective dynamic software project scheduling (2017)Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)A model of resilient supply chain network design: A two-stage programming with fuzzy shortest path (2013)Are complexity and uncertainty distinct concepts in project management? A taxonomical examination from literature (2016)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Time, cost and quality trade-off in project management: a case study (1999)When neighboring disciplines fail to learn from each other: The case of innovation and project management research (2018)Using fuzzy sets in operational research (1983)Fuzzy set theory applications in production management research: a literature survey (1998)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An integrated survey of deterministic project scheduling (2001)A fuzzy extension of Saaty's priority theory (1983)A 2-tuple fuzzy linguistic representation model for computing with words (2000)Hesitant Fuzzy Linguistic Term Sets for Decision Making (2011)
this work references cited by second hop

References

  • 1980Fuzzy Sets and Systems - Theory and Applications6,412 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1959Critical-path planning and scheduling623 cited
  • 2003Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge291 cited
  • 1981The use of fuzzy variables in pert238 cited
  • 2001Critical path analysis in the network with fuzzy activity times236 cited
  • 1979Using fuzzy set theory in a scheduling problem: A case study187 cited
  • 1994Fuzzy project scheduling system for software development144 cited
  • 1994Fuzzy critical path method132 cited
  • 2003On latest starting times and floats in activity networks with ill-known durations103 cited
  • 2002The computational complexity of the criticality problems in a network with interval activity times85 cited
  • 2002On the sure criticality of tasks in activity networks with imprecise durations83 cited
  • 1983Fuzzy-Network Planning - FNET77 cited

Cited by

  • 2011Time–cost trade-off analysis of project networks in fuzzy environments66 cited
  • 2010Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

46 cited
  • 2009Computing latest starting times of activities in interval-valued networks with minimal time lags41 cited
  • 2010Criticality analysis of activity networks under interval uncertainty39 cited
  • 2010Application of fuzzy multi-attribute decision making in determining the critical path by using time, cost, risk, and quality criteria35 cited