A new approximation algorithm for obtaining the probability distribution function for project completion time
16 references·1 citing·26 second hop
A new approximation algorithm for obtaining the probability distribution function for project completion time (2007)A new approximation algorithm for obtaini…Introduction to Stochastic Programming (2011)Introduction to Stochastic Pr…Project duration in stochastic networks by the PERT-path technique (2000)Project duration in stochasti…Introduction to Stochastic Programming (1998)Introduction to Stochastic Pr…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Advances in Project Scheduling (1989)Advances in Project SchedulingA Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987 (1989)A Classified Bibliography Of …Computational complexity of PERT problems (1988)Computational complexity of P…Markov and Markov-Regenerative pert Networks (1986)Markov and Markov-Regenerativ…The Completion Time of PERT Networks (1983)The Completion Time of PERT N…The use of cutsets in Monte Carlo analysis of stochastic networks (1979)The use of cutsets in Monte C…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis (1971)Conditional Monte Carlo: A Si…Distribution of the Time Through a Directed, Acyclic Network (1965)Distribution of the Time Thro…MONTE CARLO METHODS AND THE PERT PROBLEM (1963)MONTE CARLO METHODS AND THE P…Letter to the Editor—Monte Carlo Methods and the PERT Problem (1963)Letter to the Editor—Monte Ca…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…The Effects of Different Activity Distributions on Project Duration in PERT Networks (2014)The Effects of Different Acti…Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Bounding the Project Completion Time Distribution in PERT Networks (1985)Six decades of project management research: Thematic trends and future opportunities (2016)An Analytical Study of the PERT Assumptions (1964)Conditional value-at-risk for general loss distributions (2002)The Sample Average Approximation Method for Stochastic Discrete Optimization (2002)Theory and Applications of Robust Optimization (2010)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)An integrated survey of deterministic project scheduling (2001)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Ambulance location and relocation models (2003)Stochastic Programming Models (2003)A two-stage stochastic programming framework for transportation planning in disaster response (2004)Sample-path optimization of convex stochastic performance functions (1996)Critical-path planning and scheduling (1959)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)On criticality and sensitivity in activity networks (2000)Robust optimization for resource-constrained project scheduling with uncertain activity durations (2012)New strategies for stochastic resource-constrained project scheduling (2017)Project network models with discounted cash flows a guided tour through recent developments (1997)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)
this work references cited by second hop

References

  • 2011Introduction to Stochastic Programming6,469 cited
  • 1998Introduction to Stochastic Programming1,664 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1963Letter to the Editor—Monte Carlo Methods and the PERT Problem268 cited
  • 1963MONTE CARLO METHODS AND THE PERT PROBLEM240 cited
  • 1965Distribution of the Time Through a Directed, Acyclic Network221 cited
  • 1989Advances in Project Scheduling196 cited
  • 1986Markov and Markov-Regenerative pert Networks184 cited
  • 1988Computational complexity of PERT problems169 cited
  • 1971Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis153 cited
  • 1989A Classified Bibliography Of Research On Stochastic Pert Networks: 1966-1987119 cited
  • 1979The use of cutsets in Monte Carlo analysis of stochastic networks95 cited
  • 1983The Completion Time of PERT Networks68 cited
  • 2000Project duration in stochastic networks by the PERT-path technique

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

67 cited

Cited by

  • 2014The Effects of Different Activity Distributions on Project Duration in PERT Networks46 cited