Concurrent Delays and Apportionment of Damages
10 references·0 citing·36 second hop
Concurrent Delays and Apportionment of Damages (2010)Concurrent Delays and Apportionment of Da…Schedule Delay Analysis (2016)Schedule Delay AnalysisFLORA: New Forensic Schedule Analysis Technique (2008)FLORA: New Forensic Schedule …Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract (2007)Preallocation of Total Float …Float Consumption Impact on Cost and Schedule in the Construction Industry (2007)Float Consumption Impact on C…Daily Windows Delay Analysis (2005)Daily Windows Delay AnalysisBook Review: Smith, Currie & Hancock's Common Sense Construction Law, Third Edition , edited by Thomas J. Kelleher, Jr. Hoboken, New Jersey: John Wiley & Sons, Inc., 2005 (2005)Book Review: Smith, Currie & …United Kingdom Construction Claims: Views of Professionals (2004)United Kingdom Construction C…Window Analyses of Compensable Delays (1999)Window Analyses of Compensabl…Construction Delay Claims (1987)Construction Delay ClaimsConcurrent Delays in Construction Projects (1987)Concurrent Delays in Construc…Computer aided construction delay analysis and claims preparation (1995)Delay Analysis within Construction Contracting Organizations (2008)Critical path effect based delay analysis method for construction projects (2011)Causes of Construction Delays in Countries with High Geopolitical Risks (2016)Comparison of Delay Analysis Methodologies (1998)Probabilistic Monitoring of Project Performance Using SS-Curves (2000)Probabilistic Forecasting of Project Performance Using Stochastic S Curves (2004)Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices (2014)Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Construction delay analysis techniques (1996)Construction Delay Computation Method (2001)Selecting a delay analysis method in resolving construction claims (2005)Review of Resource-Constrained Scheduling Algorithms (2019)Why change programs don't produce change. (1990)An Organizational Perspective on Changing Buyer-Supplier Relations: A Critical Review of the Evidence (1996)An investigation into the use of construction delay and disruption analysis methodologies (2008)Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims (2019)Construction Scheduling: Preparation, Liability, and Claims (1991)Total Float Traded as Commodity (1991)Construction Law Handbook 2009 (2009)A method for project schedule delay analysis (2018)Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff (2023)Construction Delays and Their Causative Factors in Nigeria (2006)Analysing factors affecting delays in Indian construction projects (2011)Analyzing delay causes in Egyptian construction projects (2013)Reasons for Cost and Schedule Increase for Engineering Design Projects (2002)Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Exploring delay causes of road construction projects in Egypt (2016)Schedule Analysis under the Effect of Resource Allocation (2007)Analysis Methods in Time-Based Claims (2008)Understanding Construction Delay Analysis and the Role of Preconstruction Programming (2013)Issues Associated with Extension of Time (EoT) Claim in Malaysian Construction Industry (2013)Industrial Heritage: Reflections on the Use Compatibility of Cultural Sustainability and Energy Efficiency (2015)Integrated Approach to Construction Risk Management: Cost Implications (2021)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects (2023)
this work references cited by second hop

References

  • 1987Concurrent Delays in Construction Projects141 cited
  • 1987Construction Delay Claims126 cited
  • 2005Book Review: Smith, Currie & Hancock's Common Sense Construction Law, Third Edition , edited by Thomas J. Kelleher, Jr. Hoboken, New Jersey: John Wiley & Sons, Inc., 200591 cited
  • 2005Daily Windows Delay Analysis83 cited
  • 2016Schedule Delay Analysis64 cited
  • 2007Float Consumption Impact on Cost and Schedule in the Construction Industry55 cited
  • 1999Window Analyses of Compensable Delays52 cited
  • 2007Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract41 cited
  • 2004United Kingdom Construction Claims: Views of Professionals31 cited
  • 2008FLORA: New Forensic Schedule Analysis Technique29 cited

Cited by

No citing works inside the corpus for this window.